Pioneer Path Energy Storage 1

Site of 8 records

Company Tempus Power management LLC

Lead filing
Pioneer Path Energy Storage 1
Grouped by
the same grid connection point and developer
Active (MW)
817.1 across 8
Built (MW)
0 across 0
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Tap 345kV 39950 TNP ONE PLANT - 3400 TWIN OAK Ckt 2
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — Pioneer Path Energy Storage 1 Storage 102.1 Studied Tempus Power management LLC
Another phase high Pioneer Path Energy Storage 2 Storage 102.1 Studied Tempus Power management LLC
Another phase high Pioneer Path Energy Storage 3 Storage 102.1 Studied Tempus Power management LLC
Same site, relation unclear low Prairie Horizon Energy Storage 1 Storage 102.1 Studied Tempus Power management LLC
Another phase high Pioneer Path Energy Storage 4 Storage 102.1 Studied Tempus Power management LLC
Same site, relation unclear low Prairie Horizon Energy Storage 2 Storage 102.1 Studied Tempus Power management LLC
Same site, relation unclear low Prairie Horizon Energy Storage 3 Storage 102.1 Studied Tempus Power management LLC
Same site, relation unclear low Prairie Horizon Energy Storage 4 Storage 102.1 Studied Tempus Power management LLC

2. Also at this interconnection point

None recorded.

3. Sources

Sources ERCOT

Sources

  • ERCOTTerms of use · retrieved Nov 4, 2026

Attribution