Purple Sage Energy Center: the source's site coordinate and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Purple Sage Energy Center
Solar + storage
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1800
- In-service date
- (stated)
- Location
- Clark County, Nevada
Details
Who’s behind it
- Developer
- Noble Solar LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Capacity (MW)
- 400 Capacity is the interconnection request in CAISO Public Queue Report. The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 800 MW nameplate.
- Connects at
- Trout Canyon Substation 230 kVConnection point3,000 MW active (9 of 9 projects).
- EIA plant
- 68209 2 generatorsEIA generatorsPlant 68209 PSGBS, PSGPV
Timeline
- Stated In-service date stated by CAISO.
- Observed as contracted in CAISO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Rough Hat Contracted | Solar + storage | 5.1 mi | 200 |
| Hidden Hills Solar Plant 2 Postponed | Solar thermal | 6.2 mi | 250 |
| Rough Hat 2 Contracted | Solar + storage | 6.8 mi | 200 |