Rough Hat
Solar + storage
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1799
- In-service date
- (stated)
- Location
- Clark County, Nevada
Details
Who’s behind it
- Developer
- Candela Renewables, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Capacity (MW)
- 200 Capacity is the interconnection request in CAISO Public Queue Report. The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 400 MW nameplate.
- Connects at
- Trout Canyon Substation 230 kVConnection point3,000 MW active (9 of 9 projects).
- EIA plant
- 63782 generator RH1
At this site
2 records at Rough HatAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Rough Hat this record | Solar + storage | 200 | Contracted |
| Another phase medium confidence | Rough Hat 2 | Solar + storage | 200 | Contracted |
Also at this interconnection point (7)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- MOSEY Solar + storage, 500 MW, contracted at Trout Canyon Substation 230 kV
- SUNBAKED SOLAR Solar + storage, 500 MW, contracted at Trout Canyon Substation 230 kV
- Purple Sage Energy Center Solar + storage, 400 MW, contracted at Trout Canyon Substation 230 kV
- BONANZA PEAK SOLAR FARM Solar + storage, 400 MW, contracted at Trout Canyon Substation 230 kV
- LARREA SOLAR Solar + storage, 300 MW, studied at Trout Canyon Substation 230 kV
- YELLOW PINE 3 Solar + storage, 250 MW, contracted at Trout Canyon Substation 230 kV
- CALVADA SPRINGS SOLAR Solar + storage, 250 MW, contracted at Trout Canyon Substation 230 kV
Sources EIA-860M · CAISO · Permitting Dashboard
Timeline
- Stated In-service date stated by CAISO.
- Observed as contracted in CAISO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Rough Hat 2 Contracted | Solar + storage | 4.0 mi | 200 |
| Purple Sage Energy Center Contracted | Solar + storage | 5.1 mi | 400 |
| Hidden Hills Solar Plant 2 Postponed | Solar thermal | 9.0 mi | 250 |