Show on map
Rough HatRough Hat 2 — Contracted · Solar + storage · NV · 200 MW · 4.0 mi awayPurple Sage Energy Center — Contracted · Solar + storage · NV · 400 MW · 5.1 mi awayHidden Hills Solar Plant 2 — Postponed · Solar thermal · CA · 250 MW · 9.0 mi away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Solar + storage

Key facts

Solar + storage Contracted (what this status means)
Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
Clark County, Nevada

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Capacity (MW)
200 Capacity is the interconnection request in CAISO Public Queue Report. The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 400 MW nameplate.
Connects at
Trout Canyon Substation 230 kVConnection point3,000 MW active (9 of 9 projects).
EIA plant
63782 generator RH1

At this site

2 records at Rough HatAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Rough Hat this record Solar + storage 200 Contracted
Another phase medium confidence Rough Hat 2 Solar + storage 200 Contracted
Also at this interconnection point (7)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

  • MOSEY Solar + storage, 500 MW, contracted at Trout Canyon Substation 230 kV
  • SUNBAKED SOLAR Solar + storage, 500 MW, contracted at Trout Canyon Substation 230 kV
  • Purple Sage Energy Center Solar + storage, 400 MW, contracted at Trout Canyon Substation 230 kV
  • BONANZA PEAK SOLAR FARM Solar + storage, 400 MW, contracted at Trout Canyon Substation 230 kV
  • LARREA SOLAR Solar + storage, 300 MW, studied at Trout Canyon Substation 230 kV
  • YELLOW PINE 3 Solar + storage, 250 MW, contracted at Trout Canyon Substation 230 kV
  • CALVADA SPRINGS SOLAR Solar + storage, 250 MW, contracted at Trout Canyon Substation 230 kV

Sources EIA-860M · CAISO · Permitting Dashboard

Sources

Attribution

Timeline

  • Stated In-service date stated by CAISO.
  • Observed as contracted in CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rough Hat 2 Contracted Solar + storage 4.0 mi 200
Purple Sage Energy Center Contracted Solar + storage 5.1 mi 400
Hidden Hills Solar Plant 2 Postponed Solar thermal 9.0 mi 250

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution