Biomass
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-000330-1, PRO-000330-2
- In-service date
- (stated)
- Location
- Penrhos GSP, United Kingdom
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Biomass source: “Biomass”
- Capacity (MW)
- 210 Capacity is the sum of the 2 interconnection requests listed under Sources.
- Connects at
- Penrhos GSPConnection point390 MW active (2 of 2 projects).
Timeline
- Observed as filed in NESO (source status: “Scoping”).
- NESO Transmission Entry Capacity (TEC) Register: status permitted → filed.
- Stated In-service date stated by NESO. Passed 1.1 years ago; NESO still says filed.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Overdue: the stated date is more than 90 days past. Some sources stop updating dates once a project is built.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data