Show on map
Waterton Solar IIWaterton Solar I — Under construction · Solar · CO · 4 MW · 0.0 mi awayVISA USA - O.C.C. DATA CENTER CAMPUS — Built · Large load · CO · 5.5 mi awayEQUINIX DATA CENTER — Filed · Large load · CO · 12.1 mi awayNISSAN N. AMERICA - NISSAN DATA CENTER — Built · Large load · CO · 12.2 mi awayFLEXENTIAL CORP - COMPARK DATA CENTER — Built · Large load · CO · 13.0 mi awayONENECK IT-DENVER DATA CENTER — Built · Large load · CO · 13.2 mi awayCrane DataBank — Built · Large load · CO · 13.5 mi awayFlexential -Denver -Centennial Data Center — Filed · Large load · CO · 13.7 mi awayTING FIBER DATA CENTER — Built · Large load · CO · 13.8 mi awayFlexential DEN 12 Data Center - Parker — Filed · Large load · CO · 14.3 mi awayINTELISHIFT US LLC - DENVER DATA CENTER — Built · Large load · CO · 14.5 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Waterton Solar II

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Public Service Company of Colorado (PSCO)
In-service date
(stated)
Location
Douglas County, Colorado

Details

Who’s behind it

Developer
Public Service Co of Colorado · part of Xcel EnergyOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
69620 generator WTS2

At this site

2 records at Waterton Solar IAt this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Waterton Solar I Solar 4 Under construction
Another phase high confidence Waterton Solar II this record Solar 4 Under construction

Sources EIA-860M

Sources

  • EIA-860MTerms of use · retrieved Nov 4, 2026

Attribution

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-12-01.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Waterton Solar I Under construction Solar 0.0 mi 4
VISA USA - O.C.C. DATA CENTER CAMPUS Built Large load 5.5 mi
EQUINIX DATA CENTER Filed Large load 12.1 mi
NISSAN N. AMERICA - NISSAN DATA CENTER Built Large load 12.2 mi
FLEXENTIAL CORP - COMPARK DATA CENTER Built Large load 13.0 mi
ONENECK IT-DENVER DATA CENTER Built Large load 13.2 mi
Crane DataBank Built Large load 13.5 mi
Flexential -Denver -Centennial Data Center Filed Large load 13.7 mi
TING FIBER DATA CENTER Built Large load 13.8 mi
Flexential DEN 12 Data Center - Parker Filed Large load 14.3 mi
INTELISHIFT US LLC - DENVER DATA CENTER Built Large load 14.5 mi

Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution