Show on map

Exact site not public

Wingtip Solar 2

Solar + storage

As filed: WINGTIP SOLAR 2

Key facts

Solar + storage Withdrawn (what this status means)
Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
MERCED County, California (exact site not public)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Connects at
Los Banos 500 kVConnection point1,150 MW active (1 of 2 projects).

At this site

2 records at WINGTIP SOLAR 1At this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing WINGTIP SOLAR 1 Solar + storage 1,150 Contracted
Another phase high confidence WINGTIP SOLAR 2 this record Solar + storage 550 Withdrawn

Sources CAISO

Sources

Attribution

Timeline

  • Stated In-service date stated by CAISO.
  • Observed as withdrawn in CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources CAISO

Sources

  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO

Every source and license · Attribution

View at source

Report a problem