St. Marys Lane - Upminster BESS

Site of 2 records

Company Bluestone Energy Ltd

Lead filing
St. Marys Lane - Upminster BESS
Grouped by
the same grid connection point and developer
Active (MW)
480 across 2
Built (MW)
0 across 0
Withdrawn or canceled (MW)
0 across 0
EIA plant ID
—
Connects at
Warley 132kV Substation
Operating plant
—

1. Records at this site

Records at this site: the lead first; each EIA plant's units follow its first unit; every other record with its relationship to the lead, its confidence, technology, capacity, status and company.
RelationshipConfidenceNameTechnologyMWStatusCompany
Lead filing — St. Marys Lane - Upminster BESS Storage 240 Filed Bluestone Energy Ltd
Same site, relation unclear low Upminster Warley 3 Storage 240 Filed Bluestone Energy Ltd

2. Also at this interconnection point

2 other requests at the same grid connection point

From another or no named developer: they share the connection, not the site.

Other requests at this site's grid connection points, active first, each by capacity, with the company that filed it.
NameCompanyTechnologyMWStatusConnects at
Clay Tye Farm Phase 2 Harmony CTF 2 Limited Storage 49.5 Built Warley 132kV Substation
Clay Tye Farm Phase 1 Harmony CTF Limited Storage 49.5 Built Warley 132kV Substation

3. Sources

Sources NESO · GEM

Supported by National Energy SO Open Data

Sources

  • NESOTerms of use · retrieved Nov 21, 2026Supported by National Energy SO Open Data
  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution