Show on map
2555 E Olympic Bl — Power plant · Solar · Los Angeles Department of Water & PowerPRIME DATA CENTER VERNON — Built · Large load · CA · 2.9 km awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 4.2 km awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 9.5 km awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 13.2 km awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 14.7 km awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 15.4 km awayCPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 17.0 km awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 20.4 km awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 20.4 km awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 20.5 km awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 20.7 km awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 21.9 km awayScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 22.3 km awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 23.5 km away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

2555 E Olympic Bl

Power plant · Solar

Key facts

Power plant · Solarran 14% of 2019 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2019
1,252 MWh
Grid
34 kV to Los Angeles Department of Water & Power (LDWP)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2012 to 2019

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
14 years since 2012
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000814305
Location id
L100000811737
Eia plant ids
57871
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Los Angeles Department of Water & Power
Balancing authority code
LDWP
Balancing authority name
Los Angeles Department of Water and Power
Balancing authority codeLDWP

Solar array

Array area (acres)
4.6
AC capacity (MW)
1
DC capacity (MW)
1.2
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2012

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Los Angeles Department of Water & Power Operator EIA-860M
Dependable Highway Express Inc Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
PRIME DATA CENTER VERNON Built Large load 2.9 km
LATTC South Campus Solar Postponed Solar 4.2 km 1.1
Bandini - SLLAX710 Under construction Solar 9.5 km 1.3
Glenarm BESS Plant Filed Storage 13.2 km 25
Scholl Canyon Under construction Biomass 14.7 km 12
California Institute of Technology Postponed Gas, combined cycle 15.4 km 16.5
CPA 3777 Workman Postponed Solar 17.0 km 1.9
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 20.4 km 1.3
Fordyce - SLLAX680 Under construction Solar 20.4 km 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 20.5 km 1.2
Dominguez - SLLAX512 Under construction Solar 20.7 km 1.3
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 21.9 km 1.4
Scattergood Postponed Gas, combined cycle 22.3 km 346
Watson Cogeneration Withdrawn Gas, combined cycle 23.5 km 94.2

Sources EPA ICIS-NPDES · EIA-860M · CAISO

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 11, 2026Source: California ISO

Attribution