5 in 1 Dam Hydroelectric — Power plant · Hydro · Cedar Rapids Hydro DamCedar Rapids Data Center — Filed · Large load · IA · 5.0 mi awayData Center — Filed · Large load · IA · 5.1 mi awayQTS East Data Center - Temporary Crane — Filed · Large load · IA · 5.9 mi awaySuffolk/DataCenter/MobileCrane/DC5/Laydown — Filed · Large load · IA · 6.2 mi awayQTS Data Center — Filed · Large load · IA · 6.3 mi awayMobile Cranes (Cedar Rapids data centre) — Filed · Large load · IA · 6.6 mi away
  • Clean firm
  • Loads
  • In development
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

5 in 1 Dam Hydroelectric

Power plant · Hydro

Key facts

Power plant · Hydroran 3% of 2007 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1986
Net generation, 2007
470 MWh
Location
Linn County, Iowa
Operated by
Cedar Rapids Hydro DamSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2013

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
40 years since 1986
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
November 2013
Capacity retired
2.1 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Conventional Hydroelectric0.7 MWRetiredNovember 2013
GEN2Conventional Hydroelectric0.7 MWRetiredNovember 2013
GEN3Conventional Hydroelectric0.7 MWRetiredNovember 2013

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
MISO
Transmission lines within 15 mi (6)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units GEN1, GEN2, GEN3 scheduled to retire, 2.1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Cedar Rapids Data Center Filed Large load 5.0 mi
Data Center Filed Large load 5.1 mi
QTS East Data Center - Temporary Crane Filed Large load 5.9 mi
Suffolk/DataCenter/MobileCrane/DC5/Laydown Filed Large load 6.2 mi
QTS Data Center Filed Large load 6.3 mi
Mobile Cranes (Cedar Rapids data centre) Filed Large load 6.6 mi

Sources FAA OE/AAA