5 in 1 Dam Hydroelectric
Power plant · Hydro
Key facts
Power plant · Hydroran 3% of 2007 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1986
- Net generation, 2007
- 470 MWh
- Location
- Linn County, Iowa
- Operated by
- Cedar Rapids Hydro DamSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Hydro source: “Conventional Hydroelectric”
- Age
- 40 years since 1986
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- November 2013
- Capacity retired
- 2.1 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Conventional Hydroelectric | 0.7 MW | Retired | November 2013 |
| GEN2 | Conventional Hydroelectric | 0.7 MW | Retired | November 2013 |
| GEN3 | Conventional Hydroelectric | 0.7 MW | Retired | November 2013 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- MISO
Transmission lines within 15 mi (6)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units GEN1, GEN2, GEN3 scheduled to retire, 2.1 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Cedar Rapids Data Center Filed | Large load | 5.0 mi | |
| Data Center Filed | Large load | 5.1 mi | |
| QTS East Data Center - Temporary Crane Filed | Large load | 5.9 mi | |
| Suffolk/DataCenter/MobileCrane/DC5/Laydown Filed | Large load | 6.2 mi | |
| QTS Data Center Filed | Large load | 6.3 mi | |
| Mobile Cranes (Cedar Rapids data centre) Filed | Large load | 6.6 mi |
Sources FAA OE/AAA