Amazon Goodyear
Power plant · Solar
Key facts
Power plant · Solarran 24% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2023
- Net generation, 2025
- 5,081 MWh
- Grid
- 12 kV to Arizona Public Service Co (AZPS)
- Location
- Maricopa County, Arizona
- Operated by
- Westbound Solar 3, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 3 years since 2023
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 17,336 |
| Capacity factor, 2025 | 0.242 |
| Net generation (MWh), 2025 | 5,081 |
| Balancing authority code | AZPS |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 6.8
- AC capacity (MW)
- 2.4
- DC capacity (MW)
- 2.9
- Mounting
- Fixed tilt
- Site type
- Greenfield
- Began operating
- 2023
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| PHX 70 - MICROSOFT DATA CENTER Built | Large load | 0.7 km | |
| PHX73 (Goodyear data centre) Filed | Large load | 1.0 km | |
| MICROSOFT CORP - CITRUS RD Built | Large load | 1.3 km | |
| QTS PHX3 Data Center Built | Large load | 2.0 km | |
| QTS DC13 - Temp Crane - NE Filed | Large load | 2.9 km | |
| QTS DATA CENTER Under construction | Large load | 6.3 km | |
| Vantage AZ15 Under construction | Large load | 7.6 km | |
| COMPASS DATACENTERS PHX I Built | Large load | 7.8 km | |
| COMPASS DATA CENTER - MOONRAKER Built | Large load | 7.9 km | |
| MERIT 2 Built | Large load | 8.4 km | |
| Aligned Phx 7 Filed | Large load | 8.9 km | |
| White Tank Energy Storage Under construction | Storage | 10.5 km | 100 |
| PHX16 Data Center Filed | Large load | 10.6 km | |
| Microsoft Phx 83 (El Mirage data centre) Filed | Large load | 11.1 km | |
| Stream Data Center Built | Large load | 11.1 km | |
| Crane (Avondale data centre) Filed | Large load | 11.2 km | |
| Vantage Data Center 21 Under construction | Large load | 11.5 km | |
| MICROSOFT CORP - OLIVE AVE Built | Large load | 11.7 km | |
| Compass Datacenter Under construction | Large load | 13.0 km | |
| Prime Data Center Under construction | Large load | 14.6 km | |
| Sierra Luna Energy Storage Announced | Storage | 15.2 km | 150 |
Sources EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air · EIA-860M