Show on map
Arapahoe — Power plant · Coal · Public Service Co of ColoradoINTELISHIFT US LLC - DENVER DATA CENTER — Built · Large load · CO · 2.2 mi awayCORESITE - DE1 — Built · Large load · CO · 5.3 mi awayIRON MOUNTAIN DATA CENTERS - FORTRUST — Built · Large load · CO · 7.7 mi awayVISA USA - O.C.C. DATA CENTER CAMPUS — Built · Large load · CO · 7.9 mi awayFLEXENTIAL - DEN03 DATA CENTER — Large load · CO · 8.2 mi awayCORESITE REAL ESTATE DE3 - CORESITE DE3 — Built · Large load · CO · 8.3 mi awayNISSAN N. AMERICA - NISSAN DATA CENTER — Built · Large load · CO · 9.7 mi awayCrane DataBank — Built · Large load · CO · 9.9 mi awayFlexential -Denver -Centennial Data Center — Filed · Large load · CO · 10.0 mi awayEQUINIX DATA CENTER — Filed · Large load · CO · 10.8 mi awayTING FIBER DATA CENTER — Built · Large load · CO · 11.1 mi awayLOCKHEED MARTIN - DENVER DATA CENTER — Built · Large load · CO · 11.2 mi awayFLEXENTIAL CORP - COMPARK DATA CENTER — Built · Large load · CO · 11.6 mi awayONENECK IT-DENVER DATA CENTER — Built · Large load · CO · 11.8 mi awayWaterton Solar I — Under construction · Solar · CO · 4 MW · 12.3 mi awayWaterton Solar II — Under construction · Solar · CO · 4 MW · 12.3 mi awayAMAZON DATA SERVICES - DEN-22 — Built · Large load · CO · 12.4 mi awayFlexential DEN 12 Data Center - Parker — Filed · Large load · CO · 12.7 mi awayAPA060 - Phase 5 MDC (Aurora data centre) — Built · Large load · CO · 13.5 mi awaySAMARITANS PURSE DATA CENTER — Built · Large load · CO · 14.0 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coal Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1950
Net generation, 2014
0 MWh
Grid
115 kV to Public Service Co of Colorado (PSCO)
Location
Denver County, Colorado

Output

Net generation MWh by year, 2001 to 2014
Fuel burned MMBtu by year, 2001 to 2014
  • Gas
  • Coal

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
76 years since 1950
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Xcel Energy Inc
Share pct
100
Gem entity id
E100000001329
Name
Onward Energy Holdings LLC
Share pct
100
Gem entity id
E100002017732
Unit ids
G100000100308, G100000100309, G100000100310, G100000100311, G100000401840
Location id
L100000103804
Eia plant ids
465
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000467129
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001460
Balancing authority codePSCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2013
First unit retired
December 2002
Capacity retired
240.5 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal44 MWRetiredDecember 2002
2Conventional Steam Coal44 MWRetiredDecember 2002
3Conventional Steam Coal40 MWRetiredDecember 2013
4Conventional Steam Coal112.5 MWRetiredDecember 2013

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Public Service Co of Colorado
Balancing authority
Public Service Company of Colorado
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Public Service Co of Colorado Operator EIA-860M
Xcel Energy Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units 3, 4 scheduled to retire, 152.5 MW · EIA-860M
  • Stated Units 1, 2 scheduled to retire, 88 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
INTELISHIFT US LLC - DENVER DATA CENTER Built Large load 2.2 mi
CORESITE - DE1 Built Large load 5.3 mi
IRON MOUNTAIN DATA CENTERS - FORTRUST Built Large load 7.7 mi
VISA USA - O.C.C. DATA CENTER CAMPUS Built Large load 7.9 mi
FLEXENTIAL - DEN03 DATA CENTER Unknown Large load 8.2 mi
CORESITE REAL ESTATE DE3 - CORESITE DE3 Built Large load 8.3 mi
NISSAN N. AMERICA - NISSAN DATA CENTER Built Large load 9.7 mi
Crane DataBank Built Large load 9.9 mi
Flexential -Denver -Centennial Data Center Filed Large load 10.0 mi
EQUINIX DATA CENTER Filed Large load 10.8 mi
TING FIBER DATA CENTER Built Large load 11.1 mi
LOCKHEED MARTIN - DENVER DATA CENTER Built Large load 11.2 mi
FLEXENTIAL CORP - COMPARK DATA CENTER Built Large load 11.6 mi
ONENECK IT-DENVER DATA CENTER Built Large load 11.8 mi
Waterton Solar I Under construction Solar 12.3 mi 4
Waterton Solar II Under construction Solar 12.3 mi 4
AMAZON DATA SERVICES - DEN-22 Built Large load 12.4 mi
Flexential DEN 12 Data Center - Parker Filed Large load 12.7 mi
APA060 - Phase 5 MDC (Aurora data centre) Built Large load 13.5 mi
SAMARITANS PURSE DATA CENTER Built Large load 14.0 mi

Sources EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES · EIA-860M

Sources

Attribution