Show on map
Bayboro — Power plant · Oil · Duke Energy Florida, LLCSouth Tampa Energy Storage — Postponed · Storage · FL · 20 MW · 10.4 mi awayBig Bend III Battery Storage — Permitted · Storage · FL · 75 MW · 14.4 mi awayTampa Electric Co NA 3 — Postponed · Gas, combustion turbine · FL · 99 MW · 14.7 mi away
  • Combustion
  • Storage
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1973
Net generation, 2025
1,266 MWh
Grid
115 kV to Duke Energy Florida, Inc (FPC)
Location
Pinellas County, Florida
Operated by
Duke Energy Florida, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
53 years since 1973
Heat rate
15,517 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Duke Energy Corp
Share pct
100
Gem entity id
E100000001194
Unit ids
G100000414305, G100000414306, G100000414307, G100000414308
Location id
L100000409200
Eia plant ids
627
Fuel burned (MMBtu), 202519,644
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202515,516.6
Net generation (MWh), 20251,266
Balancing authority codeFPC

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Capacity retired
56.7 MW
Generators retired
1
Next scheduled retirement
November 2026
Capacity scheduled to retire
170.1 MW
Generators scheduled to retire
3
Share of in-service capacity scheduled
100%
Capacity still in service
170.1 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
P3Petroleum Liquids56.7 MWRetiredJune 2025
P1Petroleum Liquids56.7 MWScheduled to retireNovember 2026
P2Petroleum Liquids56.7 MWScheduled to retireNovember 2026
P4Petroleum Liquids56.7 MWScheduled to retireNovember 2026
Retirement changes (1)
  • Planned retirement date moved seen 2026-10-24 170.1 MW unit P1 (Petroleum Liquids, 56.7 MW): October 2026 to November 2026; unit P2 (Petroleum Liquids, 56.7 MW): October 2026 to November 2026; unit P4 (Petroleum Liquids, 56.7 MW): October 2026 to November 2026

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Duke Energy Florida, Inc
Balancing authority
Progress Energy Florida
NERC region
SERC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units P1, P2, P4 scheduled to retire, 170.1 MW · EIA-860M
  • Planned retirement date moved · EIA-860M
  • Stated Unit P3 scheduled to retire, 56.7 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
South Tampa Energy Storage Postponed Storage 10.4 mi 20
Big Bend III Battery Storage Permitted Storage 14.4 mi 75
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 14.7 mi 99

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution