Bayboro
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1973
- Net generation, 2025
- 1,266 MWh
- Grid
- 115 kV to Duke Energy Florida, Inc (FPC)
- Location
- Pinellas County, Florida
- Operated by
- Duke Energy Florida, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 53 years since 1973
- Heat rate
- 15,517 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Fuel burned (MMBtu), 2025 | 19,644 |
| Capacity factor, 2025 | 0.001 |
| Heat rate (Btu/kWh), 2025 | 15,516.6 |
| Net generation (MWh), 2025 | 1,266 |
| Balancing authority code | FPC |
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Capacity retired
- 56.7 MW
- Generators retired
- 1
- Next scheduled retirement
- November 2026
- Capacity scheduled to retire
- 170.1 MW
- Generators scheduled to retire
- 3
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 170.1 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| P3 | Petroleum Liquids | 56.7 MW | Retired | June 2025 |
| P1 | Petroleum Liquids | 56.7 MW | Scheduled to retire | November 2026 |
| P2 | Petroleum Liquids | 56.7 MW | Scheduled to retire | November 2026 |
| P4 | Petroleum Liquids | 56.7 MW | Scheduled to retire | November 2026 |
Retirement changes (1)
- Planned retirement date moved
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- Duke Energy Florida, Inc
- Balancing authority
- Progress Energy Florida
- NERC region
- SERC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units P1, P2, P4 scheduled to retire, 170.1 MW · EIA-860M
- Planned retirement date moved · EIA-860M
- Stated Unit P3 scheduled to retire, 56.7 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| South Tampa Energy Storage Postponed | Storage | 10.4 mi | 20 |
| Big Bend III Battery Storage Permitted | Storage | 14.4 mi | 75 |
| Tampa Electric Co NA 3 Postponed | Gas, combustion turbine | 14.7 mi | 99 |
Sources EIA-860M