Show on map
Belchertown Renewables Community Solar — Power plant · Solar · Belchertown Renewables, LLCBelchertown Solar PV + Battery Project — Under construction · Solar + storage · MA · 5.6 MW · 3.6 mi awayStony Brook — Postponed · Gas, combined cycle · MA · 422 MW · 12.9 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Belchertown Renewables Community Solar

Power plant · Solar

Key facts

Power plant · Solarran 18% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
6,248 MWh
Grid
13 kV to Massachusetts Electric Co (ISNE)
Location
Hampshire County, Massachusetts
Operated by
Belchertown Renewables, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Massachusetts Electric Co
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202521,316
Capacity factor, 20250.178
Net generation (MWh), 20256,248
Balancing authority codeISNE

Solar array

Array area (acres)
5.4
AC capacity (MW)
4
DC capacity (MW)
5.1
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · TransitionZero · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • TransitionZeroNon-commercial license · retrieved Oct 26, 2026TransitionZero, via Global Energy Monitor, CC BY-NC 4.0. Modified by Inframation: statuses and technologies mapped to Inframation's vocabulary. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0).
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Belchertown Solar PV + Battery Project Under construction Solar + storage 3.6 mi 5.6
Stony Brook Postponed Gas, combined cycle 12.9 mi 422

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution