Power plant · Oil

Key facts

Power plant · Oilran 12% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1912
Net generation, 2025
98,018 MWh
Grid
115 kV to Duke Energy Progress - (NC) (CPLE)
Location
Anson County, North Carolina
Operated by
Duke Energy Progress - (NC)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
114 years since 1912
Unused energy
731 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
115
Transmission owner
Duke Energy Progress - (NC)
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 2025341,960
Capacity factor, 20250.118
Net generation (MWh), 202598,018
Balancing authority codeCPLE
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 3488.7 outside 5000-30000 Btu/kWh

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Crawford Solar Postponed Solar 18.9 km 5
AMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS Built Large load 21.4 km
Longhorn Holdings Postponed Solar 23.9 km 5