Buck
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 65% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2011
- Net generation, 2025
- 3,954,147 MWh
- Grid
- 100 kV to Duke Energy Carolinas, LLC (DUK)
- Location
- Rowan County, North Carolina
- Operated by
- Duke Energy Carolinas, LLC
Output
- Gas
- Coal
- Oil
- Biomass and waste
Details
Who’s behind it
- Owner
- Duke Energy
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 15 years since 2011
- Unused energy
- 2,159 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 7,052 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 27,882,817 |
| Capacity factor, 2025 | 0.647 |
| Heat rate (Btu/kWh), 2025 | 7,051.5 |
| Net generation (MWh), 2025 | 3,954,147 |
| Balancing authority code | DUK |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 474.4 MW
- Generators retired
- 7
- Capacity still in service
- 697.9 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 3 | Conventional Steam Coal | 80 MW | Retired | May 2011 |
| 4 | Conventional Steam Coal | 40 MW | Retired | May 2011 |
| 7 | Natural Gas Fired Combustion Turbine | 34.8 MW | Retired | October 2012 |
| 8 | Natural Gas Fired Combustion Turbine | 34.8 MW | Retired | October 2012 |
| 9 | Natural Gas Fired Combustion Turbine | 34.8 MW | Retired | October 2012 |
| 5 | Conventional Steam Coal | 125 MW | Retired | May 2013 |
| 6 | Conventional Steam Coal | 125 MW | Retired | May 2013 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Conventional Steam Coal | 370 MW | |
| Natural Gas Fired Combustion Turbine | 104.4 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 100 kV
- Transmission or distribution system owner
- Duke Energy Carolinas, LLC
- Balancing authority
- Duke Energy Carolinas
- NERC region
- SERC
Transmission lines within 25 km (8)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Duke Energy Carolinas, LLC | Operator | EIA-860M | ||
| Duke Energy | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Units 5, 6 scheduled to retire, 250 MW · EIA-860M
- Stated Units 7, 8, 9 scheduled to retire, 104.4 MW · EIA-860M
- Stated Units 3, 4 scheduled to retire, 120 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Rowan Solar NC LLC Postponed | Solar | 17.9 km | 2 |
| Healing Springs Solar, LLC Filed | Solar | 22.0 km | 55 |
| Baxter Creek Solar × 2 units Under construction | Solar | 23.2 km | 60 |
| Duroc Holdings Postponed | Solar | 24.3 km | 5 |