Buck — Power plant · Gas, combined cycle · Duke Energy Carolinas, LLCRowan Solar NC LLC — Solar · NC · 2 MW · 17.9 km awayHealing Springs Solar, LLC — Solar · NC · 55 MW · 22.0 km awayBaxter Creek Solar — Solar · NC · 30 MW · 23.2 km awayBaxter Creek Solar — Solar · NC · 30 MW · 23.2 km awayDuroc Holdings — Solar · NC · 5 MW · 24.3 km away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycleran 65% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2011
Net generation, 2025
3,954,147 MWh
Grid
100 kV to Duke Energy Carolinas, LLC (DUK)
Location
Rowan County, North Carolina

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
15 years since 2011
Unused energy
2,159 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,052 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Duke Energy Corp
Share pct
100
Gem entity id
E100000001194
Unit ids
G100000101081, G100000101082, G100000101083, G100000101084, G100000401655
Location id
L100000104073
Eia plant ids
2720
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110001978334
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000831
Fuel burned (MMBtu), 202527,882,817
Capacity factor, 20250.647
Heat rate (Btu/kWh), 20257,051.5
Net generation (MWh), 20253,954,147
Balancing authority codeDUK

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
474.4 MW
Generators retired
7
Capacity still in service
697.9 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Conventional Steam Coal80 MWRetiredMay 2011
4Conventional Steam Coal40 MWRetiredMay 2011
7Natural Gas Fired Combustion Turbine34.8 MWRetiredOctober 2012
8Natural Gas Fired Combustion Turbine34.8 MWRetiredOctober 2012
9Natural Gas Fired Combustion Turbine34.8 MWRetiredOctober 2012
5Conventional Steam Coal125 MWRetiredMay 2013
6Conventional Steam Coal125 MWRetiredMay 2013
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal370 MW
Natural Gas Fired Combustion Turbine104.4 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
100 kV
Transmission or distribution system owner
Duke Energy Carolinas, LLC
Balancing authority
Duke Energy Carolinas
NERC region
SERC
Transmission lines within 25 km (8)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Duke Energy Carolinas, LLC Operator EIA-860M
Duke Energy Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 5, 6 scheduled to retire, 250 MW · EIA-860M
  • Stated Units 7, 8, 9 scheduled to retire, 104.4 MW · EIA-860M
  • Stated Units 3, 4 scheduled to retire, 120 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Rowan Solar NC LLC Postponed Solar 17.9 km 2
Healing Springs Solar, LLC Filed Solar 22.0 km 55
Baxter Creek Solar × 2 units Under construction Solar 23.2 km 60
Duroc Holdings Postponed Solar 24.3 km 5

Sources EIA-860M

Sources

Attribution