Calabasas Gas to Energy Facility — Power plant · Biomass · Los Angeles County SanitationLas Virgenes MWD - Composting Plant — Under construction · Solar + storage · CA · 1.4 MW · 2.2 mi awayHumidor Storage I — Contracted · Storage · CA · 300 MW · 9.8 mi away20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 10.0 mi awayHecate Grid Gwent Storage 1 — Announced · Storage · CA · 135 MW · 13.6 mi awayAB Van Nuys — Announced · Solar · CA · 1.6 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Calabasas Gas to Energy Facility

Power plant · Biomass

Key facts

Power plant · Biomassran 40% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
31,907 MWh
Grid
16 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2010 to 2025
Fuel burned MMBtu by year, 2010 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Biomass source: “Landfill Gas”
Age
16 years since 2010
Heat rate
17,411 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110046229568
Subparts reported
C, HH
NAICS code
562212
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1003599
Fuel burned (MMBtu), 2025555,537
Capacity factor, 20250.396
Heat rate (Btu/kWh), 202517,411.1
Net generation (MWh), 202531,907
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
4.6 MW
Generators retired
1
Capacity still in service
9.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN2Landfill Gas4.6 MWRetiredAugust 2018

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
16 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
COUNTY OF LOS ANGELES CALIFORNIA Owner 100.0% Dec 31, 2023 EPA GHGRP
Los Angeles County Sanitation Operator EIA-860M

Timeline

  • Stated Unit GEN2 scheduled to retire, 4.6 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Las Virgenes MWD - Composting Plant Under construction Solar + storage 2.2 mi 1.4
Humidor Storage I Contracted Storage 9.8 mi 300
20525 Nordhoff PV (North) Under construction Solar 10.0 mi 1.9
Hecate Grid Gwent Storage 1 Announced Storage 13.6 mi 135
AB Van Nuys Announced Solar 14.9 mi 1.6

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 22, 2026Source: California ISO