Calabasas Gas to Energy Facility
Power plant · Biomass
Key facts
Power plant · Biomassran 40% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2010
- Net generation, 2025
- 31,907 MWh
- Grid
- 16 kV to Southern California Edison Co (CISO)
- Location
- Los Angeles County, California
- Operated by
- Los Angeles County Sanitation
Output
- Biomass and waste
Details
Who’s behind it
Interested in this project?
- Technology
- Biomass source: “Landfill Gas”
- Age
- 16 years since 2010
- Heat rate
- 17,411 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 555,537 |
| Capacity factor, 2025 | 0.396 |
| Heat rate (Btu/kWh), 2025 | 17,411.1 |
| Net generation (MWh), 2025 | 31,907 |
| Balancing authority code | CISO |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 4.6 MW
- Generators retired
- 1
- Capacity still in service
- 9.2 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN2 | Landfill Gas | 4.6 MW | Retired | August 2018 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 16 kV
- Transmission or distribution system owner
- Southern California Edison Co
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| COUNTY OF LOS ANGELES CALIFORNIA | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Los Angeles County Sanitation | Operator | EIA-860M |
Timeline
- Stated Unit GEN2 scheduled to retire, 4.6 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · LBNL · CAISO · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISOSource: California ISO
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Las Virgenes MWD - Composting Plant Under construction | Solar + storage | 2.2 mi | 1.4 |
| Humidor Storage I Contracted | Storage | 9.8 mi | 300 |
| 20525 Nordhoff PV (North) Under construction | Solar | 10.0 mi | 1.9 |
| Hecate Grid Gwent Storage 1 Announced | Storage | 13.6 mi | 135 |
| AB Van Nuys Announced | Solar | 14.9 mi | 1.6 |