Cald BESS — Power plant · Storage · Cald BESS LLCPRIME DATA CENTER VERNON — Built · Large load · CA · 5.0 km awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 9.3 km awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 9.5 km awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 12.5 km awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 12.5 km awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 12.6 km awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 12.8 km awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 14.6 km awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 15.5 km awayScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 18.5 km awayCPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 19.1 km awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 20.6 km awayElevate Pier S — Filed · Storage · CA · 70 MW · 21.2 km awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 22.6 km awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 22.6 km away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
-19,333 MWh
Grid
69 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California
Operated by
Cald BESS LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
69
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-19,333
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -19333.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
PRIME DATA CENTER VERNON Built Large load 5.0 km
LATTC South Campus Solar Postponed Solar 9.3 km 1.1
Bandini - SLLAX710 Under construction Solar 9.5 km 1.3
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 12.5 km 1.3
Fordyce - SLLAX680 Under construction Solar 12.5 km 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 12.6 km 1.2
Dominguez - SLLAX512 Under construction Solar 12.8 km 1.3
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 14.6 km 1.4
Watson Cogeneration Withdrawn Gas, combined cycle 15.5 km 94.2
Scattergood Postponed Gas, combined cycle 18.5 km 346
CPA 3777 Workman Postponed Solar 19.1 km 1.9
Glenarm BESS Plant Filed Storage 20.6 km 25
Elevate Pier S Filed Storage 21.2 km 70
California Institute of Technology Postponed Gas, combined cycle 22.6 km 16.5
Scholl Canyon Under construction Biomass 22.6 km 12

Sources EPA ICIS-NPDES · EIA-860M · CAISO

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 11, 2026Source: California ISO

Attribution