Show on map
- Combustion
- Wind & solar
- Storage
- Unspecified fuel
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Unspecified fuel
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Central West Refined Products Pipeline System: route and 50 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Central West Refined Products Pipeline System
Petroleum product pipeline
Key facts
Petroleum product pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-CO, US-NM, US-TX
- Operated by
- Nustar EnergySourceEIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 1,760
- Units
- 8
All 5 attributes from EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 7 |
| Operator, as the source states it | NUSTAR ENERGY |
| Mapped segments | 8 |
| Source release | 202001 |
| Pipeline name raw | Central West Refined Products Pipeline System |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Pipelines (as of January 2020)
- EIA US Energy Atlas — Petroleum Product Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Pledger Under construction | Storage | 0.0 mi | 9.5 |
| Hecate Energy Ramsey Storage Contracted | Storage | 0.1 mi | 500 |
| M&G Resins USA Under construction | Other | 0.2 mi | 28.6 |
| Horizon Announced | Gas, combustion turbine | 0.3 mi | 480 |
| Drennan Energy Storage Filed | Storage | 0.3 mi | 100 |
| Pivot Solar 43 LLC Under construction | Solar | 0.4 mi | 3.5 |
| Pivot Solar 53 LLC Under construction | Solar | 0.4 mi | 4 |
| Texas Petrochemicals Postponed | Gas, combined cycle | 0.5 mi | 560 |
| Carol Wind, LLC Permitted | Wind | 0.5 mi | 167.8 |
| Bird Dog Energy Storage Built | Storage | 0.5 mi | 60.4 |
| Highland Solar I, LLC - (CO) Filed | Solar + storage | 0.7 mi | 400 |
| SAMARITANS PURSE DATA CENTER Built | Large load | 0.7 mi | |
| Garcitas Creek Solar Postponed | Solar | 0.9 mi | 201.9 |
| DEN1-DC2 (Aurora data centre) Filed | Large load | 1.2 mi | |
| QTS AURORA LLC - QTS DEN1 Built | Large load | 1.2 mi | |
| Pintail BESS Under construction | Storage | 1.3 mi | 200 |
| Erin Contracted | Solar | 1.5 mi | 208.3 |
| CORESITE REAL ESTATE DE3 - CORESITE DE3 Built | Large load | 1.5 mi | |
| Third Coast BESS, LLC Contracted | Storage | 1.5 mi | 102.8 |
| Danish Fields Solar, LLC Built | Solar | 1.5 mi | 602.8 |
| Flag City Solar Postponed | Solar | 1.6 mi | 167.3 |
| IREA HIGHFIELD DATA CENTER SSS4275 Built | Large load | 1.7 mi | |
| JPMORGAN CHASE - PROJECT SYCAMORE AURORA Built | Large load | 1.7 mi | |
| GulfStar Power, LLC Under construction | Solar | 1.8 mi | 451.6 |
| Pamela Heights I Energy Center Under construction | Storage | 2.0 mi | 101.7 |
| Callisto II Energy Center Under construction | Storage | 2.0 mi | 303.2 |
| IRON MOUNTAIN DATA CENTERS - FORTRUST Built | Large load | 2.1 mi | |
| Elk Station Under construction | Gas, combustion turbine | 2.3 mi | 210 |
| Wittig Solar Park Permitted | Solar | 2.4 mi | 106.9 |
| APA060 - Phase 5 MDC (Aurora data centre) Built | Large load | 2.5 mi | |
| Padua 3 Under construction | Storage | 2.7 mi | 200 |
| Lunis Creek Solar and BESS SLF Postponed | Solar + storage | 2.7 mi | 1,238.5 |
| AMAZON DATA SERVICES - DEN-22 Built | Large load | 2.7 mi | |
| El Patrimonio Contracted | Solar | 2.8 mi | 152.3 |
| Alamo City ESS Contracted | Storage | 2.9 mi | 128.2 |
| Jack Fusco Energy Center Postponed | Gas, combined cycle | 2.9 mi | 400 |
| Crowned Heron 2 - Storage, LLC Built | Storage | 3.1 mi | 154.2 |
| Charger Solar Built | Solar | 3.1 mi | 397.1 |
| Sundance (CO) Under construction | Solar + storage | 3.2 mi | 124.9 |
| Elio Energy LLC Contracted | Storage | 3.5 mi | 205.3 |
| BEACON POINT DATA CENTER PROJECT Under construction | Large load | 3.6 mi | |
| Pike Solar Hybrid Postponed | Storage | 3.9 mi | 25 |
| LOCKHEED MARTIN - DENVER DATA CENTER Built | Large load | 4.2 mi | |
| Corazon Energy Storage Under construction | Storage | 4.4 mi | 150 |
| CORESITE - DE1 Built | Large load | 4.7 mi | |
| Honeycomb Solar and Storage Under construction | Solar + storage | 4.7 mi | 137.9 |
| Rush ESS Studied | Storage | 4.7 mi | 201.3 |
| Ray Ranch Solar Under construction | Solar | 4.7 mi | 255.2 |
| Hornet Solar II (TX) (Hybrid) Contracted | Solar + storage | 4.8 mi | 401.5 |
| TX Nazareth Solar Permitted | Solar | 4.8 mi | 201 |
Sources EIA-860M · ERCOT · EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air · Berkeley Lab
Sources
- EIA-860M
- ERCOT
- EPA ICIS-NPDES
- FAA OE/AAA
- EPA ICIS-Air
- Berkeley LabLawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.