Century Generating Facility — Power plant · Gas, combustion turbine · Colton Power LPCA Bloomington 2551 S Lilac Avenue Micro — Solar + storage · CA · 3 MW · 2.3 km awaySolar Photovoltaic Project #24 — Solar · CA · 4 MW · 3.1 km awayCA Riverside 2356 Fleetwood Dr. — Solar + storage · CA · 4 MW · 6.0 km awaySolar Photovoltaic Project #30 — Solar · CA · 1.5 MW · 6.7 km awaySolar Photovoltaic Project #28 — Solar · CA · 0.5 MW · 8.2 km awaySolar Photovoltaic Project #25 — Solar · CA · 4.5 MW · 10.0 km awaySolar Photovoltaic Project #27 — Solar · CA · 1 MW · 10.1 km awaySunE Redlands — Solar · CA · 1.5 MW · 10.2 km awayOES Biogas Power — Biomass · CA · 2.6 MW · 12.5 km awaySolar Photovoltaic Project #17 — Solar · CA · 0.5 MW · 13.9 km awayRedlands DC 9 - sline609 — Solar + storage · CA · 5 MW · 14.0 km awaySolar Photovoltaic Project #20 — Solar · CA · 3.5 MW · 14.2 km awaySolar Photovoltaic Project #14 — Solar · CA · 1.5 MW · 14.2 km awaySolar Photovoltaic Project #10 — Solar · CA · 0.5 MW · 15.2 km awaySolar Photovoltaic Project #18 — Solar · CA · 0.5 MW · 15.2 km awaySolar Photovoltaic Project #19 — Solar · CA · 5 MW · 15.3 km awaySolar Photovoltaic Project #04 — Solar · CA · 1.5 MW · 15.4 km awaySolar Photovoltaic Project #23 — Solar · CA · 0.5 MW · 15.5 km awayEnergy Center — Gas, combustion turbine · CA · 0.9 MW · 17.4 km awaySolar Photovoltaic Project #21 — Solar · CA · 2.5 MW · 18.5 km awaySolar Photovoltaic Project #12 — Solar · CA · 0.5 MW · 19.3 km awaySolar Photovoltaic Project #08 — Solar · CA · 0.5 MW · 19.6 km awaySolar Photovoltaic Project #31 — Solar · CA · 1 MW · 19.8 km awaySolar Photovoltaic Project #09 — Solar · CA · 0.5 MW · 20.2 km awayRoadhouse Energy Center — Storage · CA · 300 MW · 20.8 km awayAmazon - Moreno Valley — Solar · CA · 2.2 MW · 23.5 km awayRCWMD Badlands Landfill Gas Project — Biomass · CA · 1.2 MW · 23.9 km away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Century Generating Facility

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2001
Net generation, 2025
563 MWh
Grid
66 kV to City of Colton - (CA) (CISO)
Location
San Bernardino County, California
Operated by
Colton Power LPSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
25 years since 2001
Unused energy
392 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
15,869 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
66
Transmission owner
City of Colton - (CA)
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20258,934
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202515,868.6
Net generation (MWh), 2025563
Balancing authority codeCISO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 2.3 km 3
Solar Photovoltaic Project #24 Postponed Solar 3.1 km 4
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 6.0 km 4
Solar Photovoltaic Project #30 Postponed Solar 6.7 km 1.5
Solar Photovoltaic Project #28 Postponed Solar 8.2 km 0.5
Solar Photovoltaic Project #25 Postponed Solar 10.0 km 4.5
Solar Photovoltaic Project #27 Postponed Solar 10.1 km 1
SunE Redlands Postponed Solar 10.2 km 1.5
OES Biogas Power Under construction Biomass 12.5 km 2.6
Solar Photovoltaic Project #17 Postponed Solar 13.9 km 0.5
Redlands DC 9 - sline609 Under construction Solar + storage 14.0 km 5
Solar Photovoltaic Project #20 Postponed Solar 14.2 km 3.5
Solar Photovoltaic Project #14 Postponed Solar 14.2 km 1.5
Solar Photovoltaic Project #10 Postponed Solar 15.2 km 0.5
Solar Photovoltaic Project #18 Postponed Solar 15.2 km 0.5
Solar Photovoltaic Project #19 Postponed Solar 15.3 km 5
Solar Photovoltaic Project #04 Postponed Solar 15.4 km 1.5
Solar Photovoltaic Project #23 Postponed Solar 15.5 km 0.5
Energy Center Announced Gas, combustion turbine 17.4 km 0.9
Solar Photovoltaic Project #21 Postponed Solar 18.5 km 2.5
Solar Photovoltaic Project #12 Postponed Solar 19.3 km 0.5
Solar Photovoltaic Project #08 Postponed Solar 19.6 km 0.5
Solar Photovoltaic Project #31 Postponed Solar 19.8 km 1
Solar Photovoltaic Project #09 Postponed Solar 20.2 km 0.5
Roadhouse Energy Center Contracted Storage 20.8 km 300
Amazon - Moreno Valley Postponed Solar 23.5 km 2.2
RCWMD Badlands Landfill Gas Project Postponed Biomass 23.9 km 1.2

Sources EIA-860M · CAISO

Sources

Attribution