CES Placerita Power Plant — Power plant · Gas, combined cycle · CES Placerita IncVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 6.2 mi awaySix Flags Magic Mountain — Under construction · Solar + storage · CA · 12 MW · 6.6 mi awayHomestead Energy Storage LLC — Postponed · Storage · CA · 14 MW · 10.1 mi away20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 11.0 mi awayAB Van Nuys — Announced · Solar · CA · 1.6 MW · 11.1 mi awayFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 11.5 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

CES Placerita Power Plant

Power plant · Gas, combined cycle

Key facts

Power plant · Gas, combined cycle Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1988
Net generation, 2008
0 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California
Operated by
CES Placerita IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2008
Fuel burned MMBtu by year, 2001 to 2008
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
Age
38 years since 1988
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
AES Corp
Share pct
25
Gem entity id
E100000001305
Name
Carbon Direct Inc
Share pct
25
Gem entity id
E100002016567
Name
Nexus Development Capital LLC
Share pct
25
Gem entity id
E100002016566
Name
Paramount Resources Ltd
Share pct
12.50
Gem entity id
E100002016570
Unit ids
G100000401600
Location id
L100000401776
Eia plant ids
10677
Eia status
By code
OS
Mw
90
Units
2
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
90
Out of service mw
90
Balancing authority codeCISO

Retirement

Capacity retired
60 MW
Generators retired
1
Capacity still in service
90 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
UNT1Natural Gas Fired Combined Cycle60 MWRetiredJanuary 2008

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
66 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit UNT1 scheduled to retire, 60 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Van Norman Bypass Solar Project Postponed Solar 6.2 mi 2
Six Flags Magic Mountain Under construction Solar + storage 6.6 mi 12
Homestead Energy Storage LLC Postponed Storage 10.1 mi 14
20525 Nordhoff PV (North) Under construction Solar 11.0 mi 1.9
AB Van Nuys Announced Solar 11.1 mi 1.6
Foothill Solar Project Postponed Solar 11.5 mi 1.1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution