Chisago - Kohlman Lake 345 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 345 kV
- States crossed
- US-MN
- Owner (as stated)
- Northern States Power Minnesota
Details
Who’s behind it
- Owner
- Northern States Power Minnesota
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 38
- Substations at the ends (as the source names them)
- Chisago to Kohlman Lake
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | northern states power minnesota |
| HIFLD line ID | 142363 |
| Voltage class | 345 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Novel Holmquist Solar CSG Postponed | Solar | 0.1 mi | 1 |
| North Star Energy Storage, LLC Under construction | Storage | 1.3 mi | 80 |
| HB FULLER CO - DATA CENTER - ARDEN HILLS Built | Large load | 5.8 mi | |
| FAIRVIEW DATA CENTER Built | Large load | 9.6 mi | |
| TC Solar RCE Postponed | Solar | 10.4 mi | 1 |
| SUPERCOMPUTER LLC Built | Large load | 12.2 mi | |
| DATABANK - EAGAN - MSP2 Built | Large load | 14.4 mi | |
| Dakota Solar Postponed | Solar | 14.5 mi | 3 |
| EAGAN 5 MW DATA CENTER Built | Large load | 14.6 mi | |
| IRON GATE DATA CENTERS - EAGAN Built | Large load | 14.6 mi |
Sources EIA-860M · EPA ICIS-Air