Comcast - Universal City — Power plant · Gas, other · Bloom EnergyAB Van Nuys — Announced · Solar · CA · 1.6 MW · 8.8 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 8.9 mi awayFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 9.4 mi awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 9.7 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 12.0 mi awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 12.2 mi awayVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 12.6 mi awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 13.5 mi away20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 14.3 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Comcast - Universal City

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 78% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
6,852 MWh
Grid
4 kV to Los Angeles Department of Water & Power (CISO)
Location
Los Angeles County, California
Operated by
Bloom EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
5 years since 2021
Heat rate
8,110 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
4.20
Transmission owner
Los Angeles Department of Water & Power
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202555,567
Capacity factor, 20250.782
Heat rate (Btu/kWh), 20258,109.6
Net generation (MWh), 20256,852
Balancing authority codeCISO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AB Van Nuys Announced Solar 8.8 mi 1.6
LATTC South Campus Solar Postponed Solar 8.9 mi 1.1
Foothill Solar Project Postponed Solar 9.4 mi 1.1
Scholl Canyon Under construction Biomass 9.7 mi 12
PRIME DATA CENTER VERNON Built Large load 12.0 mi
Glenarm BESS Plant Filed Storage 12.2 mi 25
Van Norman Bypass Solar Project Postponed Solar 12.6 mi 2
California Institute of Technology Postponed Gas, combined cycle 13.5 mi 16.5
20525 Nordhoff PV (North) Under construction Solar 14.3 mi 1.9

Sources EIA-860M · EPA ICIS-NPDES