Show on map
Cunningham — Power plant · Gas, combustion turbine · Southwestern Public Service CoAC Ranch I — Solar · NM · 75 MW · 7.6 km awayAC Ranch II — Solar · NM · 230 MW · 7.6 km awayCunningham Solar II — Solar · NM · 196 MW · 8.2 km away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 46% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1965
Net generation, 2025
1,792,031 MWh
Grid
230 kV, 115 kV to Southwestern Public Service Co (SWPP)
Location
Lea County, New Mexico

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
61 years since 1965
Heat rate
11,091 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071161667
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000755
Fuel burned (MMBtu), 202519,875,252
Capacity factor, 20250.461
Heat rate (Btu/kWh), 202511,090.9
Net generation (MWh), 20251,792,031
Balancing authority codeSWPP

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Capacity retired
75 MW
Generators retired
1
Next scheduled retirement
December 2027
Last scheduled retirement
December 2040
Capacity scheduled to retire
444.2 MW
Generators scheduled to retire
3
Share of in-service capacity scheduled
100%
Capacity still in service
444.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine75 MWRetiredJanuary 2024
2Natural Gas Steam Turbine190.4 MWScheduled to retireDecember 2027
3Natural Gas Fired Combustion Turbine126.9 MWScheduled to retireDecember 2040
4Natural Gas Fired Combustion Turbine126.9 MWScheduled to retireDecember 2040
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine75 MW190.4 MW
Natural Gas Fired Combustion Turbine253.8 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV, 115 kV
Transmission or distribution system owner
Southwestern Public Service Co
Balancing authority
Southwest Power Pool
NERC region
MRO
Transmission lines within 25 km (9)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Southwestern Public Service Co Operator EIA-860M
Xcel Energy Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 3, 4 scheduled to retire, 253.8 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 190.4 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 75 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
AC Ranch I Under construction Solar 7.6 km 75
AC Ranch II Filed Solar 7.6 km 230
Cunningham Solar II Permitted Solar 8.2 km 196

Sources EIA-860M

Sources

Attribution