Show on map
Danish Fields Storage — Power plant · Storage · Danish Fields Storage, LLCDanish Fields Solar, LLC — Built · Solar · TX · 602.8 MW · 0.0 km awayHecate Energy Ramsey Storage — Contracted · Storage · TX · 500 MW · 2.3 km awayMatagorda Clean Energy Center (BESS) — Under construction · Storage · TX · 10.1 MW · 9.5 km awayFlag City Solar — Postponed · Solar · TX · 167.3 MW · 14.8 km awayEldora Energy LLC — Contracted · Solar + storage · TX · 402.2 MW · 19.0 km awayLunis Creek Solar and BESS SLF — Postponed · Solar + storage · TX · 1,238.5 MW · 19.3 km awayDuffy BESS — Under construction · Storage · TX · 241.1 MW · 22.0 km awayBlackcat BESS — Studied · Storage · TX · 200.6 MW · 22.4 km awayVentures BESS — Studied · Storage · TX · 238 MW · 22.5 km awayCity Breeze Energy Storage — Under construction · Storage · TX · 143.1 MW · 24.4 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Danish Fields Storage

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2026
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Wharton County, Texas
Operated by
Danish Fields Storage, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
0 years since 2026
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019315
Location id
L100001017328
Eia plant ids
66914
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Danish Fields Solar, LLC Built Solar 0.0 km 602.8
Hecate Energy Ramsey Storage Contracted Storage 2.3 km 500
Matagorda Clean Energy Center (BESS) Under construction Storage 9.5 km 10.1
Flag City Solar Postponed Solar 14.8 km 167.3
Eldora Energy LLC Contracted Solar + storage 19.0 km 402.2
Lunis Creek Solar and BESS SLF Postponed Solar + storage 19.3 km 1,238.5
Duffy BESS Under construction Storage 22.0 km 241.1
Blackcat BESS Studied Storage 22.4 km 200.6
Ventures BESS Studied Storage 22.5 km 238
City Breeze Energy Storage Under construction Storage 24.4 km 143.1

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution