Division — Power plant · Oil · NRG Cabrillo Power Ops IncCA National City Terminal Ave — Solar · CA · 1.1 MW · 3.1 km awayEnerSmart Imperial Beach BESS — Storage · CA · 6 MW · 11.1 km awayAlvarado Hydro Facility — Hydro · CA · 1.4 MW · 13.3 km awayEnerSmart Murray BESS — Storage · CA · 21 MW · 15.1 km awayL3 Harris San Diego — Solar · CA · 1.6 MW · 15.7 km awayEnerSmart Mesa Heights Sub Station — Storage · CA · 3 MW · 16.1 km awayEnerSmart El Cajon BESS — Storage · CA · 3 MW · 22.7 km away
  • Combustion
  • Wind & solar
  • Storage
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2003 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1968
Net generation, 2003
1,701 MWh
Location
San Diego County, California
Operated by
NRG Cabrillo Power Ops IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2003
Fuel burned MMBtu by year, 2001 to 2003
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
58 years since 1968

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2003
Capacity retired
16 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
DIGTPetroleum Liquids16 MWRetiredDecember 2003

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit DIGT scheduled to retire, 16 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CA National City Terminal Ave Under construction Solar 3.1 km 1.1
EnerSmart Imperial Beach BESS Postponed Storage 11.1 km 6
Alvarado Hydro Facility Postponed Hydro 13.3 km 1.4
EnerSmart Murray BESS Postponed Storage 15.1 km 21
L3 Harris San Diego Under construction Solar 15.7 km 1.6
EnerSmart Mesa Heights Sub Station Under construction Storage 16.1 km 3
EnerSmart El Cajon BESS Postponed Storage 22.7 km 3