Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
Dixie: route and 50 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Dixie
HGL pipeline
Key facts
HGL pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-AL, US-GA, US-LA, US-MS, US-NC, US-SC, US-TX
- Operated by
- Enterprise ProductsSourceEIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 1,338
- Units
- 4
All 5 attributes from EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 4 |
| Operator, as the source states it | ENTERPRISE PRODUCTS |
| Mapped segments | 4 |
| Source release | 202001 |
| Pipeline name raw | Dixie |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, HGL Pipelines (as of January 2020)
- EIA US Energy Atlas — Hydrocarbon Gas Liquids (HGL) Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Longhorn Holdings Postponed | Solar | 0.4 km | 5 |
| AMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS Built | Large load | 1.3 km | |
| New Hill 1 Battery Under construction | Storage | 1.5 km | 56 |
| ADDITIONS AND MODIFICATIONS TO SYNOVUS DATA CENTER Unknown | Large load | 1.5 km | |
| H Allen Franklin Combined Cycle Postponed | Gas, combined cycle | 2.0 km | 688.1 |
| IRMO DATA CENTER Unknown | Large load | 2.5 km | |
| Trinity River Solar 1 × 2 units Filed | Solar | 2.9 km | 225 |
| SCE&G IRMO DATA CENTER Unknown | Large load | 3.4 km | |
| Coneflower Storage Project LLC Contracted | Storage | 3.7 km | 170.8 |
| AIKEN 5 MW DATA CENTER Under construction | Large load | 4.9 km | |
| SR Norwood Under construction | Solar | 5.2 km | 107 |
| Amelia Energy Center Postponed | Gas, combined cycle | 5.6 km | 900 |
| Orange County Advanced Power Station Under construction | Gas, combined cycle | 6.8 km | 1,306 |
| Gum Swamp Solar, LLC Under construction | Solar | 8.2 km | 80 |
| Noor Solar Filed | Solar | 8.4 km | 188.2 |
| Westlake Power Station Announced | Gas, combined cycle | 9.8 km | 819.4 |
| River Otter Solar Postponed | Solar | 10.4 km | 5 |
| Covington (MS) Permitted | Solar | 10.4 km | 96 |
| GCCISD NEW TECHNOLOGY DATA CENTER Unknown | Large load | 10.5 km | |
| Rock House Solar Studied | Solar + storage | 10.9 km | 250 |
| Juniper Solar Permitted | Solar | 11.3 km | 74.9 |
| Cedar Bayou 5 Under construction | Gas, combustion turbine | 12.3 km | 697 |
| SR Bacon Under construction | Solar | 12.3 km | 85 |
| SR Bacon II Permitted | Solar | 12.3 km | 115 |
| SR Bacon III Permitted | Solar | 12.3 km | 100 |
| LTM1750 (Raleigh data centre) Filed | Large load | 12.7 km | |
| AL Solar C LLC Postponed | Solar | 14.3 km | 80 |
| SR Marion Junction Permitted | Solar | 15.1 km | 15 |
| FIDELITY REAL ESTATE CO.- FIDELITY MORRISVILLE DATA CENTER Built | Large load | 15.2 km | |
| Robinson Solar Plant Filed | Solar | 15.4 km | 76 |
| Mowata Solar Filed | Solar | 15.9 km | 150 |
| Fishwater Solar Postponed | Solar | 16.1 km | 2 |
| Chatham Park Solar Farm Postponed | Solar | 16.4 km | 20 |
| Fairfield Solar Postponed | Solar | 16.8 km | 10 |
| Lotus Solar Permitted | Solar | 16.9 km | 75 |
| Crawford Solar Postponed | Solar | 17.4 km | 5 |
| Centaurus Solar - GA Postponed | Solar | 17.4 km | 400 |
| Wolf Pit Branch Solar, LLC Postponed | Solar + storage | 17.9 km | 77.5 |
| Talbot County Energy Announced | Gas, combustion turbine | 17.9 km | 262 |
| ACEHOST RALEIGH - DURHAM DATA CENTER Built | Large load | 18.2 km | |
| Longtown Energy Storage Under construction | Storage | 18.3 km | 4.5 |
| SR Lott Permitted | Solar | 18.5 km | 8.3 |
| Scotch Grove Solar Filed | Solar | 20.1 km | 80 |
| Legend Power Station Studied | Gas, other | 20.2 km | 820 |
| Baytown Postponed | Biomass | 20.4 km | 1.3 |
| B & K Solar Under construction | Solar | 21.2 km | 74.9 |
| Dadswell Solar Postponed | Solar | 21.4 km | 1 |
| McDougald Solar, LLC Postponed | Solar | 21.6 km | 4.9 |
| E B Harris Electric Generating Plant Postponed | Gas, combined cycle | 21.9 km | 1,230 |
Sources EIA-860M · EPA ICIS-Air · Berkeley Lab · EPA ICIS-NPDES · ERCOT · FAA OE/AAA
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- ERCOT GIS Report (Generator Interconnection Status)
- FAA OE/AAA Part 77 obstruction evaluation case archives (data-centre sites, buildings and cranes)