Downey — Power plant · Storage · Hybrid-Electric Building Technologies West Los Angeles 1, LLCBandini - SLLAX710 — Solar · CA · 1.3 MW · 7.2 km awaySouth Bay Dis Ctr 6-SLLAX680 — Solar · CA · 1.3 MW · 12.2 km awayFordyce - SLLAX680 — Solar · CA · 1.3 MW · 12.2 km awaySouth Bay Dis Ctr 12 - SLLAX104 — Solar · CA · 1.2 MW · 12.3 km awayDominguez - SLLAX512 — Solar · CA · 1.3 MW · 12.7 km awayPRIME DATA CENTER VERNON — Large load · CA · 13.1 km awayCPA 3777 Workman — Solar · CA · 1.9 MW · 13.9 km awayWatson Cogeneration — Gas, combined cycle · CA · 94.2 MW · 15.7 km awayLATTC South Campus Solar — Solar · CA · 1.1 MW · 18.1 km awayTorrance Dis Ctr 2 - SLLAX100 — Solar · CA · 1.4 MW · 19.2 km awayElevate Pier S — Storage · CA · 70 MW · 19.3 km awayMarici — Storage · CA · 400 MW · 19.5 km awayWestminster Reliability Project, LLC — Storage · CA · 110 MW · 19.5 km awayGlenarm BESS Plant — Storage · CA · 25 MW · 23.2 km awayCalifornia Institute of Technology — Gas, combined cycle · CA · 16.5 MW · 24.4 km away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
-149 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2020 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
7 years since 2019
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-149
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -149.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Hybrid-Electric Building Technologies West Los Angeles 1, LLC Operator EIA-860M
Sk Holdings Co. Ltd. Owner 50.0% 31 Dec 2025 EIA-860
SUSI Partners AG Owner 50.0% 31 Dec 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Bandini - SLLAX710 Under construction Solar 7.2 km 1.3
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 12.2 km 1.3
Fordyce - SLLAX680 Under construction Solar 12.2 km 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 12.3 km 1.2
Dominguez - SLLAX512 Under construction Solar 12.7 km 1.3
PRIME DATA CENTER VERNON Built Large load 13.1 km
CPA 3777 Workman Postponed Solar 13.9 km 1.9
Watson Cogeneration Withdrawn Gas, combined cycle 15.7 km 94.2
LATTC South Campus Solar Postponed Solar 18.1 km 1.1
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 19.2 km 1.4
Elevate Pier S Filed Storage 19.3 km 70
Marici Under construction Storage 19.5 km 400
Westminster Reliability Project, LLC Under construction Storage 19.5 km 110
Glenarm BESS Plant Filed Storage 23.2 km 25
California Institute of Technology Postponed Gas, combined cycle 24.4 km 16.5

Sources EIA-860M · EPA ICIS-NPDES · CAISO