East Longmeadow Solar PV — Power plant · Solar · NSTAR Electric CompanyPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 8.3 mi awayStony Brook — Postponed · Gas, combined cycle · MA · 422 MW · 10.8 mi awayEllington Solar One — Postponed · Solar · CT · 2 MW · 11.2 mi awayChicopee BESS — Under construction · Storage · MA · 5 MW · 11.8 mi awayRiverside Holyoke — Postponed · Hydro · MA · 1.1 MW · 12.7 mi awayHolyoke MA BESS 1 — Under construction · Storage · MA · 5 MW · 12.8 mi awayWillington Solar One, LLC — Under construction · Solar · CT · 2 MW · 13.1 mi awayCT Airport Authority Solar One — Announced · Solar · CT · 4 MW · 13.4 mi awayHadley Falls — Postponed · Hydro · MA · 3.5 MW · 13.6 mi awayWindsor Locks — Under construction · Solar · CT · 1.8 MW · 14.3 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

East Longmeadow Solar PV

Power plant · Solar

Key facts

Power plant · Solarran 19% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
8,398 MWh
Grid
13 kV to NSTAR Electric Company (ISNE)
Location
Hampden County, Massachusetts
Operated by
NSTAR Electric CompanySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
7 years since 2019
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815508
Location id
L100000812848
Eia plant ids
62059
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.20
Transmission owner
NSTAR Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 202528,654
Capacity factor, 20250.192
Net generation (MWh), 20258,398
Balancing authority codeISNE

Solar array

Array area (acres)
18.5
AC capacity (MW)
5
DC capacity (MW)
7
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2019

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Palmer Renewable Energy Postponed Biomass 8.3 mi 42
Stony Brook Postponed Gas, combined cycle 10.8 mi 422
Ellington Solar One Postponed Solar 11.2 mi 2
Chicopee BESS Under construction Storage 11.8 mi 5
Riverside Holyoke Postponed Hydro 12.7 mi 1.1
Holyoke MA BESS 1 Under construction Storage 12.8 mi 5
Willington Solar One, LLC Under construction Solar 13.1 mi 2
CT Airport Authority Solar One Announced Solar 13.4 mi 4
Hadley Falls Postponed Hydro 13.6 mi 3.5
Windsor Locks Under construction Solar 14.3 mi 1.8

Sources EIA-860M