Eastshore 230 kV line — Transmission lineHAYWARD DATA CENTER — Large load · CA · 0.0 mi awayPittsburg RV Solar — Under construction · Solar · CA · 2.8 MW · 3.3 mi awaySan Leandro 10 - sleba702 — Under construction · Solar · CA · 1 MW · 6.1 mi awayBishop Ranch - BR 3-HH — Under construction · Solar + storage · CA · 1.4 MW · 6.4 mi awayBishop Ranch - BR 3-GG — Under construction · Solar + storage · CA · 1.9 MW · 6.5 mi awayBishop Ranch - BR 3-FF — Under construction · Solar + storage · CA · 1.4 MW · 6.5 mi awayGateway#1&2 (Newark CA) — Announced · Solar · CA · 1.1 MW · 6.5 mi awayDynegy Oakland Power Plant — Announced · Storage · CA · 43.3 MW · 8.1 mi away7999 Gateway Solar — Under construction · Solar · CA · 4.6 MW · 8.3 mi awayOakley Generating Station — Withdrawn · Gas, combined cycle · CA · 672.3 MW · 8.3 mi awaySolano Wind — Postponed · Wind · CA · 95.5 MW · 8.8 mi awayWaste Management Tri-Cities LFGTE — Postponed · Biomass · CA · 4.8 MW · 11.2 mi awayNorCal FPV 1 (Pond 2) — Under construction · Solar · CA · 1.8 MW · 11.7 mi awayNorCal FPV 1 — Under construction · Solar · CA · 10 MW · 11.8 mi awayValero Refinery Cogeneration Unit 2 — Postponed · Gas, other · CA · 51 MW · 12.3 mi awayFremont CA AutoFactory — Under construction · Solar · CA · 3.8 MW · 12.8 mi awaySan Francisco Electric Reliability Proj — Withdrawn · Gas, combustion turbine · CA · 151.5 MW · 13.5 mi awayRichmond Cogen — Postponed · Gas, combined cycle · CA · 43 MW · 14.3 mi awaySan Francisco Intl Airport Ct Project — Postponed · Gas, combustion turbine · CA · 48 MW · 14.7 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Eastshore 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
40
Substations at the ends (as the source names them)
Eastshore
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID309257
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
HAYWARD DATA CENTER Unknown Large load 0.0 mi
Pittsburg RV Solar Under construction Solar 3.3 mi 2.8
San Leandro 10 - sleba702 Under construction Solar 6.1 mi 1
Bishop Ranch - BR 3-HH Under construction Solar + storage 6.4 mi 1.4
Bishop Ranch - BR 3-GG Under construction Solar + storage 6.5 mi 1.9
Bishop Ranch - BR 3-FF Under construction Solar + storage 6.5 mi 1.4
Gateway#1&2 (Newark CA) Announced Solar 6.5 mi 1.1
Dynegy Oakland Power Plant Announced Storage 8.1 mi 43.3
7999 Gateway Solar Under construction Solar 8.3 mi 4.6
Oakley Generating Station Withdrawn Gas, combined cycle 8.3 mi 672.3
Solano Wind Postponed Wind 8.8 mi 95.5
Waste Management Tri-Cities LFGTE Postponed Biomass 11.2 mi 4.8
NorCal FPV 1 (Pond 2) Under construction Solar 11.7 mi 1.8
NorCal FPV 1 Under construction Solar 11.8 mi 10
Valero Refinery Cogeneration Unit 2 Postponed Gas, other 12.3 mi 51
Fremont CA AutoFactory Under construction Solar 12.8 mi 3.8
San Francisco Electric Reliability Proj Withdrawn Gas, combustion turbine 13.5 mi 151.5
Richmond Cogen Postponed Gas, combined cycle 14.3 mi 43
San Francisco Intl Airport Ct Project Postponed Gas, combustion turbine 14.7 mi 48

Sources EPA ICIS-NPDES · EIA-860M · CAISO

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 17, 2026Source: California ISO