Show on map
El Paso Natural Gas Co — Gas pipeline · El Paso Natural Gas CoFirstEnergy — Postponed · Gas, combined cycle · AZ · 1,080 MW · 0.0 mi awayCPUS WEST FRYE ROAD, LP — Built · Large load · AZ · 0.0 mi awayNTEC Gas Plant — Filed · Gas, combustion turbine · NM · 1,089 MW · 0.1 mi awayApache Station — Postponed · Gas, combustion turbine · AZ · 102.2 MW · 0.1 mi awayCoyanosa Gas — Under construction · Gas, reciprocating engine · TX · 10 MW · 0.1 mi awaySaddleback Generation Station — Announced · Gas, combined cycle · AZ · 1,250 MW · 0.1 mi awayCarol Wind, LLC — Permitted · Wind · TX · 167.8 MW · 0.1 mi awayPHX16 Data Center — Filed · Large load · AZ · 0.2 mi awayMohave Energy Park — Filed · Gas, combustion turbine · AZ · 242 MW · 0.2 mi awayAfton Generating Station — Postponed · Gas, combined cycle · NM · 177 MW · 0.3 mi awayBox Canyon (AZ) — Postponed · Storage · AZ · 300 MW · 0.3 mi awayCrane (Avondale data centre) — Filed · Large load · AZ · 0.3 mi awayWestside - (NM) — Under construction · Gas, reciprocating engine · NM · 60 MW · 0.4 mi awayAMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 — Under construction · Large load · AZ · 0.4 mi awayStream Data Center — Built · Large load · AZ · 0.4 mi awayUSS Hermanas Solar — Under construction · Solar · NM · 3.3 MW · 0.4 mi awayTexas Clean Energy Project — Postponed · Gas, other · TX · 400 MW · 0.4 mi awaySierra Luna Energy Storage — Announced · Storage · AZ · 150 MW · 0.6 mi awayCrane 2 BESS 2 — Postponed · Storage · TX · 150 MW · 0.6 mi awayThistle Data Center Crane — Filed · Large load · AZ · 0.6 mi awaySaddleback BESS2 — Under construction · Other · TX · 9.9 MW · 0.7 mi awayPrime Data Center — Under construction · Large load · AZ · 0.8 mi awayTAA Solar Facility — Postponed · Solar · AZ · 2.8 MW · 0.8 mi awayAC Ranch I — Under construction · Solar · NM · 75 MW · 0.8 mi awayAC Ranch II — Filed · Solar · NM · 230 MW · 0.8 mi awayVantage Data Center 21 — Under construction · Large load · AZ · 0.8 mi awayWhite Tank Energy Storage — Under construction · Storage · AZ · 100 MW · 0.8 mi away1000 Mile Solar — Under construction · Solar · TX · 300 MW · 0.9 mi awayATLAS Solar X, LLC — Announced · Solar · AZ · 225 MW · 0.9 mi awayBuckeye Generation Center, LLC — Postponed · Gas, combustion turbine · AZ · 652.2 MW · 0.9 mi awayUSS Gold Solar — Under construction · Solar · NM · 4.3 MW · 1.0 mi awayIron Mountain Data Center — Under construction · Large load · AZ · 1.0 mi awayCoolidge Generation Station — Under construction · Gas, combustion turbine · AZ · 297 MW · 1.1 mi awayPHOENIX DATA CENTER — Built · Large load · AZ · 1.1 mi awayNewman Buffer — Filed · Solar · TX · 102.2 MW · 1.1 mi awayOPPIDAN EL PASO DATA CENTER — Built · Large load · TX · 1.2 mi awayKnapp BESS — Under construction · Storage · TX · 10 MW · 1.2 mi awayLa Luz Energy Center — Postponed · Gas, combustion turbine · NM · 42.3 MW · 1.2 mi awayStack Data Center — Filed · Large load · AZ · 1.2 mi awayChiltepin Solar — Postponed · Solar · TX · 100 MW · 1.3 mi awayATLAS Solar XI, LLC — Announced · Solar · AZ · 200 MW · 1.5 mi awayRockmont Solar and Storage Project — Filed · Solar + storage · NM · 130 MW · 1.5 mi awayMCDOWELL ROAD DATA CENTER — Built · Large load · AZ · 1.5 mi awayTHREE SISTERS Solar Generation and BESS — Filed · Solar + storage · AZ · 600 MW · 1.5 mi awayQTS 40th Street — Filed · Large load · AZ · 1.5 mi awayIBOS - Seafox El Paso (El Paso data centre) — Filed · Large load · TX · 1.5 mi awayCOMPASS DATA CENTER - MOONRAKER — Built · Large load · AZ · 1.6 mi awayRaven Sol Solar CSG — Under construction · Solar · NM · 5 MW · 1.6 mi awayCYRUSONE - CHANDLER — Built · Large load · AZ · 1.7 mi awayUSS Fletcher Solar — Under construction · Solar · NM · 1.7 MW · 1.7 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Unspecified fuel
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

El Paso Natural Gas Co

Gas pipeline · interstate

Key facts

Gas pipeline · interstate Operating
Mapped route length
Mapped route length: sourceEIA Energy Atlas · Open licensemiles
Class
interstate
States crossed
US-AZ, US-CA, US-CO, US-NM, US-NV, US-OK, US-TX
Operated by
El Paso Natural Gas CoSourceEIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Pipeline class
interstate
Mapped route length (miles)
7,306Two lengthsMapped route length is this pipeline’s route as mapped (EIA Energy Atlas); onshore transmission miles under Attributes is what the operator reported to PHMSA for 2025 for its whole onshore gas transmission system, so the two need not agree.
Technology
Interstate source: “Interstate”
Units
480
All 5 attributes from EIA US Energy Atlas — Natural Gas Interstate and Intrastate Pipelines (line geometries)
Attributes
AttributeValue
PHMSA operator annual report
PHMSA operator ID
4280
Report year
2025
Operator, as PHMSA names it
EL PASO NATURAL GAS CO
Years with an incident
2021, 2022, 2023, 2024, 2025
Miles by decade installed
1940s
1,475.9
1950s
3,825.8
1960s
1,728.3
1970s
305.2
1980s
1,077.8
1990s
580.6
2000s
420.0
2010s
94.09
2020s
66.98
Before 1940
588.0
Miles by diameter (inches)
6
510.0
8
566.8
10
551.9
12
489.0
14
76.51
16
229.2
18
82.38
20
1,044.9
22
0.840
24
981.2
26
815.9
28
0.020
30
3,549.3
32
0
34
584.6
36
264.3
40
0.010
42
52.84
46
0
48
0.010
Other
82.70
4 or less
281.2
Incidents, last 5 years
13
Incidents with an injury, last 5 years
1
Incidents with a fatality, last 5 years
1
Incidents with ignition, last 5 years
2
Onshore transmission miles
10,162.5
Incidents with an explosion, last 5 years
1
Mapped parts255
Status, as the source states itOperating
Mapped segments480
Source release202001
Data notes (1)
  • Significant incidents, last 5 years not shown: PHMSA's significant flag is published in PHMSA_Pipeline_Safety_Flagged_Incidents.zip, which could not be retrieved; the public incident file carries neither the flag nor the 1984-dollar cost its definition uses

Around this pipeline

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
FirstEnergy Postponed Gas, combined cycle 0.0 mi 1,080
CPUS WEST FRYE ROAD, LP Built Large load 0.0 mi
NTEC Gas Plant Filed Gas, combustion turbine 0.1 mi 1,089
Apache Station Postponed Gas, combustion turbine 0.1 mi 102.2
Coyanosa Gas Under construction Gas, reciprocating engine 0.1 mi 10
Saddleback Generation Station Announced Gas, combined cycle 0.1 mi 1,250
Carol Wind, LLC Permitted Wind 0.1 mi 167.8
PHX16 Data Center Filed Large load 0.2 mi
Mohave Energy Park Filed Gas, combustion turbine 0.2 mi 242
Afton Generating Station Postponed Gas, combined cycle 0.3 mi 177
Box Canyon (AZ) Postponed Storage 0.3 mi 300
Crane (Avondale data centre) Filed Large load 0.3 mi
Westside - (NM) Under construction Gas, reciprocating engine 0.4 mi 60
AMERICAN AIRLINES - PHX DATA CENTER BLDG 1920 Under construction Large load 0.4 mi
Stream Data Center Built Large load 0.4 mi
USS Hermanas Solar Under construction Solar 0.4 mi 3.3
Texas Clean Energy Project Postponed Gas, other 0.4 mi 400
Sierra Luna Energy Storage Announced Storage 0.6 mi 150
Crane 2 BESS 2 Postponed Storage 0.6 mi 150
Thistle Data Center Crane Filed Large load 0.6 mi
Saddleback BESS2 Under construction Other 0.7 mi 9.9
Prime Data Center Under construction Large load 0.8 mi
TAA Solar Facility Postponed Solar 0.8 mi 2.8
AC Ranch I Under construction Solar 0.8 mi 75
AC Ranch II Filed Solar 0.8 mi 230
Vantage Data Center 21 Under construction Large load 0.8 mi
White Tank Energy Storage Under construction Storage 0.8 mi 100
1000 Mile Solar Under construction Solar 0.9 mi 300
ATLAS Solar X, LLC Announced Solar 0.9 mi 225
Buckeye Generation Center, LLC Postponed Gas, combustion turbine 0.9 mi 652.2
USS Gold Solar Under construction Solar 1.0 mi 4.3
Iron Mountain Data Center Under construction Large load 1.0 mi
Coolidge Generation Station Under construction Gas, combustion turbine 1.1 mi 297
PHOENIX DATA CENTER Built Large load 1.1 mi
Newman Buffer Filed Solar 1.1 mi 102.2
OPPIDAN EL PASO DATA CENTER Built Large load 1.2 mi
Knapp BESS Under construction Storage 1.2 mi 10
La Luz Energy Center Postponed Gas, combustion turbine 1.2 mi 42.3
Stack Data Center Filed Large load 1.2 mi
Chiltepin Solar Postponed Solar 1.3 mi 100
ATLAS Solar XI, LLC Announced Solar 1.5 mi 200
Rockmont Solar and Storage Project Filed Solar + storage 1.5 mi 130
MCDOWELL ROAD DATA CENTER Built Large load 1.5 mi
THREE SISTERS Solar Generation and BESS Filed Solar + storage 1.5 mi 600
QTS 40th Street Filed Large load 1.5 mi
IBOS - Seafox El Paso (El Paso data centre) Filed Large load 1.5 mi
COMPASS DATA CENTER - MOONRAKER Built Large load 1.6 mi
Raven Sol Solar CSG Under construction Solar 1.6 mi 5
CYRUSONE - CHANDLER Built Large load 1.7 mi
USS Fletcher Solar Under construction Solar 1.7 mi 1.7

Sources EIA-860M · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES

Sources

Attribution