Show on map
EMWD - San Jacinto RWRF NEM — Power plant · Solar · SkyHigh 2 SolarLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 7.0 mi awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 7.0 mi awayTrestles Grid LLC — Postponed · Storage · CA · 150 MW · 9.2 mi awayRCWMD Badlands Landfill Gas Project — Postponed · Biomass · CA · 1.2 MW · 12.7 mi awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 12.9 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 13.7 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

EMWD - San Jacinto RWRF NEM

Power plant · Solar

Key facts

Power plant · Solarran 27% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
3,082 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
Riverside County, California
Operated by
SkyHigh 2 SolarSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
5 years since 2021
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815560
Location id
L100000812898
Eia plant ids
64397
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202510,515
Capacity factor, 20250.271
Net generation (MWh), 20253,082
Balancing authority codeCISO

Solar arrays

Array area (acres)
12
AC capacity (MW)
1.3
DC capacity (MW)
1.6
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2021

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Lake Perris Solar Postponed Solar 7.0 mi 1.5
San Jacinto Solar Postponed Solar 7.0 mi 1.5
Trestles Grid LLC Postponed Storage 9.2 mi 150
RCWMD Badlands Landfill Gas Project Postponed Biomass 12.7 mi 1.2
Perris DC 5 - sline015 Under construction Solar 12.9 mi 1.6
Amazon - Moreno Valley Postponed Solar 13.7 mi 2.2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution