Amazon TUS2 — Power plant · Solar · SkyHigh 2 SolarNiagara Bottling - Seguin — Power plant · Solar · SkyHigh 2 SolarTruStile Doors - Denver — Power plant · Solar · SkyHigh 2 SolarEMWD - Perris Valley RWRF — Power plant · Solar · SkyHigh 2 SolarFirestone Walker Brewery - Phase 1 — Power plant · Solar · SkyHigh 2 SolarEMWD - Sun City RWRF — Power plant · Solar · SkyHigh 2 SolarCSU San Jose State University — Power plant · Solar · SkyHigh 2 SolarBYU - Hawaii — Power plant · Solar · SkyHigh 2 SolarEMWD - San Jacinto RWRF NEM — Power plant · Solar · SkyHigh 2 SolarEl Dorado County — Power plant · Solar · SkyHigh 2 SolarEMWD - San Jacinto RES BCT — Power plant · Solar · SkyHigh 2 SolarEMWD - Moreno Valley RWRF — Power plant · Solar · SkyHigh 2 SolarCalifornia State Univ at Channel Islands — Power plant · Solar · SkyHigh 2 SolarTES Rowtier — Power plant · Solar · SkyHigh 2 SolarNiagara Bottling - Rialto — Power plant · Solar · SkyHigh 2 SolarData Center — Filed · Large load · CA · 0.2 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 0.4 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 0.4 mi awayDC-N (San Jose data centre) — Filed · Large load · CA · 0.9 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 1.4 mi awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 1.6 mi awayLOCKHEED MARTIN - DENVER DATA CENTER — Built · Large load · CO · 1.7 mi awayTrestles Grid LLC — Postponed · Storage · CA · 150 MW · 2.0 mi awayCORESITE REAL ESTATE DE3 - CORESITE DE3 — Built · Large load · CO · 2.8 mi awayIRON MOUNTAIN DATA CENTERS - FORTRUST — Built · Large load · CO · 3.3 mi awaySKYBOX DATA CENTER — Built · Large load · CA · 4.2 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 4.3 mi awayLBA Data Center West — Filed · Large load · CA · 4.3 mi away4054 Digital Realty — Built · Large load · CA · 4.5 mi away1200 Memorex Skybox Data Center — Filed · Large load · CA · 4.6 mi awayClear Springs Energy Center — Postponed · Gas, combustion turbine · TX · 549 MW · 4.7 mi awayKifer BESS 1 — Under construction · Storage · CA · 50 MW · 4.7 mi awayPRIME DATA CENTERS — Built · Large load · CA · 4.9 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 5.3 mi awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 5.3 mi awayLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 5.3 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 5.4 mi awayVANTAGE DATA CENTERS MANAGEMENT CO , LLC — Large load · CA · 5.5 mi awayEdgecore -3580 — Filed · Large load · CA · 5.6 mi awayCORESITE - DE1 — Built · Large load · CO · 5.6 mi awayEDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT — Large load · CA · 5.7 mi awaySV8 DATA CENTER — Large load · CA · 5.7 mi awayTAA Solar Facility — Postponed · Solar · AZ · 2.8 MW · 6.0 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 6.1 mi awaySolar Photovoltaic Project #19 — Postponed · Solar · CA · 5 MW · 6.2 mi awaySolar Photovoltaic Project #18 — Postponed · Solar · CA · 0.5 MW · 6.3 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 6.5 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 6.6 mi awaySolar Photovoltaic Project #23 — Postponed · Solar · CA · 0.5 MW · 6.6 mi awaySJC02 & SJC03 DATA CENTER — Large load · CA · 6.6 mi awaySolar Photovoltaic Project #10 — Postponed · Solar · CA · 0.5 MW · 6.6 mi awaySolar Photovoltaic Project #04 — Postponed · Solar · CA · 1.5 MW · 7.0 mi awayWildomar Solar — Postponed · Solar · CA · 1.2 MW · 7.0 mi awayChiquito Grid, LLC — Postponed · Storage · CA · 80 MW · 7.9 mi awayRCWMD Badlands Landfill Gas Project — Postponed · Biomass · CA · 1.2 MW · 8.1 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 8.2 mi awaySolar Photovoltaic Project #21 — Postponed · Solar · CA · 2.5 MW · 8.5 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 8.5 mi awayINTELISHIFT US LLC - DENVER DATA CENTER — Built · Large load · CO · 8.7 mi awayCHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER — Large load · CA · 8.8 mi awaySolar Photovoltaic Project #31 — Postponed · Solar · CA · 1 MW · 8.9 mi awayEquinix SV-19 - 131 Great Oaks Blvd SJ — Filed · Large load · CA · 8.9 mi away888 Ross Data Center — Filed · Large load · CA · 9.4 mi awaySolar Photovoltaic Project #12 — Postponed · Solar · CA · 0.5 MW · 10.0 mi awayGuadalupe Generating Station — Postponed · Gas, combustion turbine · TX · 320 MW · 10.2 mi away
  • Wind & solar
  • Operating
  • Other companies nearby
  • 10 · 100 · 1,000 MW

SkyHigh 2 Solar

Follow this company

Independent power producer

Key facts

Independent power producer · 42.3 MW
Assets
15
Projects
1
States
AZ, CA, CO, HI, MA, TX
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,120 of 50,273 companies here. Why

Gross output of plants with a stake

15 of 15 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 15 of 15 plants with a stake: US plants with an EIA monthly series.100% of the output is from 15 plants recorded as wholly owned.15 plants: operator, wholly owned per EIA-860.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2020 to 2025
  • Solar
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearSolarTotal (MWh)
202585,45285,452
202478,59678,596
202382,75182,751
202274,60974,609
202114,07314,073
2020 (part year)208208

Sources EIA-860 · EIA-860M · EIA

Sources

  • EIA-860Open license · retrieved Nov 9, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Attribution

Assets 15

Assets

15

Capacity

42.3 MW

MW by fuel
  1. Solar: 42.3 MW, 15 assets

Operates 15 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Held by
BYU - Hawaii Solar Operates 5 MW US-HI SkyHigh 2 Solar
Niagara Bottling - Seguin Solar Operates 4.9 MW US-TX SkyHigh 2 Solar
EMWD - San Jacinto RES BCT Solar Operates 4.2 MW US-CA SkyHigh 2 Solar
Niagara Bottling - Rialto Solar Operates 4.2 MW US-CA SkyHigh 2 Solar
California State Univ at Channel Islands Solar Operates 3.7 MW US-CA SkyHigh 2 Solar
EMWD - Perris Valley RWRF Solar Operates 3.4 MW US-CA SkyHigh 2 Solar
TES Rowtier Solar Operates 3 MW US-MA SkyHigh 2 Solar
Amazon TUS2 Solar Operates 2.6 MW US-AZ SkyHigh 2 Solar
EMWD - Moreno Valley RWRF Solar Operates 2.4 MW US-CA SkyHigh 2 Solar
CSU San Jose State University Solar Operates 1.7 MW US-CA SkyHigh 2 Solar
EMWD - Sun City RWRF Solar Operates 1.6 MW US-CA SkyHigh 2 Solar
Firestone Walker Brewery - Phase 1 Solar Operates 1.6 MW US-CA SkyHigh 2 Solar
El Dorado County Solar Operates 1.5 MW US-CA SkyHigh 2 Solar
EMWD - San Jacinto RWRF NEM Solar Operates 1.3 MW US-CA SkyHigh 2 Solar
TruStile Doors - Denver Solar Operates 1.2 MW US-CO SkyHigh 2 Solar

Sources EIA-860M · GEM

Sources

  • EIA-860MOpen license · retrieved Oct 30, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

Around this company

Nearby 73

within 15 mi

Projects

73

within 15 mi

Nearest

0.2 mi

Data Center

All 73NearbyShowing all 73 nearby projects. The 50 nearest are listed.

How these are matched

Exact-grade projects within 15 mi of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 15 mi of this company’s assets, sorted by distance, nearest first: 50 rows for the nearest of 73.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Filed Data Center Large load — 0.2 mi away nearest: CSU San Jose State University
Postponed Solar Photovoltaic Project #25 Solar 4.5 MW 0.4 mi away nearest: Niagara Bottling - Rialto
Postponed Solar Photovoltaic Project #27 Solar 1 MW 0.4 mi away nearest: Niagara Bottling - Rialto
Filed DC-N (San Jose data centre) Large load — 0.9 mi away nearest: CSU San Jose State University
Postponed Amazon - Moreno Valley Solar 2.2 MW 1.4 mi away nearest: EMWD - Moreno Valley RWRF
Under construction Perris DC 5 - sline015 Solar 1.6 MW 1.6 mi away nearest: EMWD - Moreno Valley RWRF
Built LOCKHEED MARTIN - DENVER DATA CENTER Large load — 1.7 mi away nearest: TruStile Doors - Denver
Postponed Trestles Grid LLC Storage 150 MW 2.0 mi away nearest: EMWD - Perris Valley RWRF
Built CORESITE REAL ESTATE DE3 - CORESITE DE3 Large load — 2.8 mi away nearest: TruStile Doors - Denver
Built IRON MOUNTAIN DATA CENTERS - FORTRUST Large load — 3.3 mi away nearest: TruStile Doors - Denver
Built SKYBOX DATA CENTER Large load — 4.2 mi away nearest: CSU San Jose State University
Postponed Solar Photovoltaic Project #30 Solar 1.5 MW 4.3 mi away nearest: Niagara Bottling - Rialto
Filed LBA Data Center West Large load — 4.3 mi away nearest: CSU San Jose State University
Built 4054 Digital Realty Large load — 4.5 mi away nearest: CSU San Jose State University
Filed 1200 Memorex Skybox Data Center Large load — 4.6 mi away nearest: CSU San Jose State University
Postponed Clear Springs Energy Center Gas, combustion turbine 549 MW 4.7 mi away nearest: Niagara Bottling - Seguin
Under construction Kifer BESS 1 Storage 50 MW 4.7 mi away nearest: CSU San Jose State University
Built PRIME DATA CENTERS Large load — 4.9 mi away nearest: CSU San Jose State University
Under construction OES Biogas Power Biomass 2.6 MW 5.3 mi away nearest: Niagara Bottling - Rialto
Postponed San Jacinto Solar Solar 1.5 MW 5.3 mi away nearest: EMWD - Moreno Valley RWRF
Postponed Lake Perris Solar Solar 1.5 MW 5.3 mi away nearest: EMWD - Moreno Valley RWRF
Under construction CA Bloomington 2551 S Lilac Avenue Micro Solar + storage 3 MW 5.4 mi away nearest: Niagara Bottling - Rialto
Unknown VANTAGE DATA CENTERS MANAGEMENT CO , LLC Large load — 5.5 mi away nearest: CSU San Jose State University
Filed Edgecore -3580 Large load — 5.6 mi away nearest: CSU San Jose State University
Built CORESITE - DE1 Large load — 5.6 mi away nearest: TruStile Doors - Denver
Unknown EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Large load — 5.7 mi away nearest: CSU San Jose State University
Unknown SV8 DATA CENTER Large load — 5.7 mi away nearest: CSU San Jose State University
Postponed TAA Solar Facility Solar 2.8 MW 6.0 mi away nearest: Amazon TUS2
Postponed Solar Photovoltaic Project #17 Solar 0.5 MW 6.1 mi away nearest: Niagara Bottling - Rialto
Postponed Solar Photovoltaic Project #19 Solar 5 MW 6.2 mi away nearest: Niagara Bottling - Rialto
Postponed Solar Photovoltaic Project #18 Solar 0.5 MW 6.3 mi away nearest: Niagara Bottling - Rialto
Postponed Solar Photovoltaic Project #14 Solar 1.5 MW 6.5 mi away nearest: Niagara Bottling - Rialto
Postponed Solar Photovoltaic Project #24 Solar 4 MW 6.6 mi away nearest: Niagara Bottling - Rialto
Postponed Solar Photovoltaic Project #23 Solar 0.5 MW 6.6 mi away nearest: Niagara Bottling - Rialto
Unknown SJC02 & SJC03 DATA CENTER Large load — 6.6 mi away nearest: CSU San Jose State University
Postponed Solar Photovoltaic Project #10 Solar 0.5 MW 6.6 mi away nearest: Niagara Bottling - Rialto
Postponed Solar Photovoltaic Project #04 Solar 1.5 MW 7.0 mi away nearest: Niagara Bottling - Rialto
Postponed Wildomar Solar Solar 1.2 MW 7.0 mi away nearest: EMWD - Sun City RWRF
Postponed Chiquito Grid, LLC Storage 80 MW 7.9 mi away nearest: EMWD - Sun City RWRF
Postponed RCWMD Badlands Landfill Gas Project Biomass 1.2 MW 8.1 mi away nearest: EMWD - Moreno Valley RWRF
Under construction CA Riverside 2356 Fleetwood Dr. Solar + storage 4 MW 8.2 mi away nearest: Niagara Bottling - Rialto
Postponed Solar Photovoltaic Project #21 Solar 2.5 MW 8.5 mi away nearest: Niagara Bottling - Rialto
Postponed Solar Photovoltaic Project #28 Solar 0.5 MW 8.5 mi away nearest: Niagara Bottling - Rialto
Built INTELISHIFT US LLC - DENVER DATA CENTER Large load — 8.7 mi away nearest: TruStile Doors - Denver
Unknown CHINA MOBILE INTERNATIONAL SAN JOSE DATA CENTER Large load — 8.8 mi away nearest: CSU San Jose State University
Postponed Solar Photovoltaic Project #31 Solar 1 MW 8.9 mi away nearest: Niagara Bottling - Rialto
Filed Equinix SV-19 - 131 Great Oaks Blvd SJ Large load — 8.9 mi away nearest: CSU San Jose State University
Filed 888 Ross Data Center Large load — 9.4 mi away nearest: CSU San Jose State University
Postponed Solar Photovoltaic Project #12 Solar 0.5 MW 10.0 mi away nearest: Niagara Bottling - Rialto
Postponed Guadalupe Generating Station Gas, combustion turbine 320 MW 10.2 mi away nearest: Niagara Bottling - Seguin

Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · CAISO

Sources

  • FAA OE/AAAOpen license · retrieved Nov 9, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO

Every source and license · Attribution