Equilon Los Angeles Refining — Power plant · Gas, other · Tesoro Refining & Marketing CompanyWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 1.8 mi awayElevate Pier S — Filed · Storage · CA · 70 MW · 1.9 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 3.4 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 3.6 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 3.7 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 3.7 mi awaySan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 4.9 mi awayTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 6.0 mi awayWestminster Reliability Project, LLC — Under construction · Storage · CA · 110 MW · 12.9 mi awayScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 14.1 mi awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 14.4 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 14.5 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Equilon Los Angeles Refining

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 48% of 2024 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1982
Net generation, 2024
347,224 MWh
Grid
36 kV to Los Angeles Department of Water & Power (LDWP)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Gases”
Age
44 years since 1982
Heat rate
17,311 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071161537
Subparts reported
C, DD, P, PP, Y
NAICS code
324110
Subpart PP (CO2 supply)
Yes
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006627
Fuel burned (MMBtu), 20253,567,167
Capacity factor, 20250.283
Heat rate (Btu/kWh), 202517,310.8
Net generation (MWh), 2025206,066.6
Balancing authority codeLDWP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
November 2025
First unit retired
June 2025
Capacity retired
83 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN2Other Gases30 MWRetiredJune 2025
GEN1Other Gases30 MWRetiredNovember 2025
GEN3Other Gases23 MWRetiredNovember 2025

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
36 kV
Transmission or distribution system owner
Los Angeles Department of Water & Power
Balancing authority
Los Angeles Department of Water and Power
NERC region
WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Tesoro Refining & Marketing Company Operator EIA-860M
Marathon Petroleum Company LP Owner 100.0% Dec 31, 2023 EPA GHGRP
MARATHON PETROLEUM CORP Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Units GEN1, GEN3 scheduled to retire, 53 MW · EIA-860M
  • Stated Unit GEN2 scheduled to retire, 30 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Watson Cogeneration Withdrawn Gas, combined cycle 1.8 mi 94.2
Elevate Pier S Filed Storage 1.9 mi 70
Dominguez - SLLAX512 Under construction Solar 3.4 mi 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 3.6 mi 1.2
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 3.7 mi 1.3
Fordyce - SLLAX680 Under construction Solar 3.7 mi 1.3
San Pedro Public Market (SPPM) Under construction Solar 4.9 mi 1.2
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 6.0 mi 1.4
Westminster Reliability Project, LLC Under construction Storage 12.9 mi 110
Scattergood Postponed Gas, combined cycle 14.1 mi 346
Bandini - SLLAX710 Under construction Solar 14.4 mi 1.3
PRIME DATA CENTER VERNON Built Large load 14.5 mi

Sources EIA-860M · CAISO · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026