Show on map
Fayetteville 230 kV line — Transmission lineScotch Grove Solar — Filed · Solar · NC · 80 MW · 0.0 mi awayGum Swamp Solar, LLC — Under construction · Solar · NC · 80 MW · 0.8 mi awayInnovative Solar 53 — Postponed · Solar · NC · 40 MW · 1.0 mi awayWestfield Solar, LLC — Under construction · Solar · NC · 40 MW · 2.5 mi awayAMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS — Built · Large load · NC · 5.4 mi awayLonghorn Holdings — Postponed · Solar · NC · 5 MW · 5.7 mi awayCollard Holdings Solar — Postponed · Solar · NC · 10 MW · 6.8 mi awayFriesian Holdings — Postponed · Solar · NC · 75 MW · 8.3 mi awayHowardtown Farm — Postponed · Solar · NC · 10 MW · 10.1 mi awayIsland Grove Solar — Postponed · Solar · NC · 2 MW · 10.6 mi awayCrawford Solar — Postponed · Solar · NC · 5 MW · 13.3 mi awayInnovative Solar 68 — Postponed · Solar · NC · 48.3 MW · 13.4 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Fayetteville 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC
Owner (as stated)
Duke Energy Progress

Details

Who’s behind it

Owner
Duke Energy Progress

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
49
Substations at the ends (as the source names them)
Fayetteville
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy progress
HIFLD line ID148759
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Scotch Grove Solar Filed Solar 0.0 mi 80
Gum Swamp Solar, LLC Under construction Solar 0.8 mi 80
Innovative Solar 53 Postponed Solar 1.0 mi 40
Westfield Solar, LLC Under construction Solar 2.5 mi 40
AMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS Built Large load 5.4 mi
Longhorn Holdings Postponed Solar 5.7 mi 5
Collard Holdings Solar Postponed Solar 6.8 mi 10
Friesian Holdings Postponed Solar 8.3 mi 75
Howardtown Farm Postponed Solar 10.1 mi 10
Island Grove Solar Postponed Solar 10.6 mi 2
Crawford Solar Postponed Solar 13.3 mi 5
Innovative Solar 68 Postponed Solar 13.4 mi 48.3

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution