Florence Mill: location and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Florence Mill
Power plant · Biomass
Key facts
Power plant · Biomassran 52% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1974
- Net generation, 2025
- 419,390 MWh
- Grid
- 115 kV to Duke Energy Progress - (NC) (CPLE)
- Location
- Florence County, South Carolina
- Operated by
- WestRock-Florence
Output
- Gas
- Coal
- Oil
- Biomass and waste
Details
Who’s behind it
- Owner
- Westrock CO
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Wood/Wood Waste Biomass”
- Age
- 52 years since 1974
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 14,632,565 |
| Capacity factor, 2025 | 0.523 |
| Net generation (MWh), 2025 | 419,389.9 |
| Balancing authority code | CPLE |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 34890.1 outside 5000-30000 Btu/kWh
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 12.3 MW
- Generators retired
- 1
- Capacity still in service
- 91.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Wood/Wood Waste Biomass | 12.3 MW | Retired | December 2025 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- Duke Energy Progress - (NC)
- Balancing authority
- Duke Energy Progress East
- NERC region
- SERC
Transmission lines within 15 mi (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| WestRock-Florence | Operator | EIA-860M | ||
| WESTROCK CO | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Unit GEN1 scheduled to retire, 12.3 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Rhubarb One SC Filed | Solar | 8.6 mi | 9.6 |
| McCormick Solar Postponed | Solar | 10.1 mi | 2 |
| MYRA - Building 1 (Marion data centre) Filed | Large load | 12.3 mi |
Sources EIA-860M · FAA OE/AAA