- Combustion
- Bioenergy
- Operating
- Retired
- Other companies nearby
- 10 · 100 · 1,000 MW
Map
- Combustion
- Bioenergy
- Operating
- Retired
- Other companies nearby
17 assets
17 assets. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Westrock CO
Power plant owner
As filed: WESTROCK CO
Key facts
Power plant owner · 1,280.9 MW- Capacity held
- 1,280.9MW
- Assets
- 17
- States
- AL, CT, FL, GA, LA, NC and more
- Headquarters
- Richmond, United States Source: Wikidata
- Website
- westrock.com Source: Wikidata
- LEI
- 549300JEB576INN13W07 Source: Wikidata
- Wikipedia
- English article Source: Wikidata
- Parent
- No parent recordedNo parent recordedLike 48,145 of 50,298 companies here. Why
Gross output of plants with a stake
17 of 17 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 17 of 17 plants with a stake: US plants with an EIA monthly series.96% of the output is from 16 plants recorded as wholly owned.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.
- Gas
- Bioenergy
Yearly totals
| Year | Gas | Bioenergy | Total (MWh) |
|---|---|---|---|
| 2026 (part year) | — | 2,434,918 | 2,434,918 |
| 2025 | 150,119 | 4,712,490 | 4,862,609 |
| 2024 | 138,720 | 4,567,411 | 4,706,131 |
| 2023 | 128,869 | 4,686,005 | 4,814,874 |
| 2022 | 100,025 | 5,305,603 | 5,405,628 |
| 2021 | 141,894 | 5,640,147 | 5,782,041 |
| 2020 | 157,934 | 5,887,034 | 6,044,968 |
| 2019 | 148,690 | 5,886,480 | 6,035,170 |
| 2018 | 120,298 | 6,168,521 | 6,288,819 |
| 2017 | 96,602 | 6,240,796 | 6,337,398 |
| 2016 | 125,892 | 6,257,446 | 6,383,338 |
| 2015 | 196,607 | 6,153,008 | 6,349,615 |
| 2014 | 217,812 | 6,040,895 | 6,258,707 |
| 2013 | 190,712 | 5,915,448 | 6,106,160 |
| 2012 | 219,539 | 5,789,245 | 6,008,784 |
| 2011 | 214,509 | 5,885,970 | 6,100,479 |
| 2010 | 218,051 | 5,728,847 | 5,946,898 |
| 2009 | 133,354 | 5,538,689 | 5,672,043 |
| 2008 | 592,727 | 5,345,055 | 5,937,782 |
| 2007 | 603,225 | 5,298,580 | 5,901,805 |
| 2006 | 565,007 | 5,332,026 | 5,897,033 |
| 2005 | 651,528 | 4,915,110 | 5,566,637 |
| 2004 | 703,335 | 5,343,279 | 6,046,614 |
| 2003 | 381,065 | 3,857,232 | 4,238,297 |
| 2002 | 121,610 | 5,079,090 | 5,200,700 |
| 2001 | 97,287 | 5,045,407 | 5,142,694 |
Assets 17
Assets
17
Capacity
1,281 MW
- Biomass: 1,085 MW, 14 assets
- Gas, combustion turbine: 163 MW, 1 asset
- Gas, steam turbine: 32.8 MW, 2 assets
Operates 1 power plant · Owns 17 power plants
| Name. Sort by name, A to Z | Type. Sort by type, A to Z | Role. Sort by role, A to Z | MW, sorted descending. Sort by capacity, smallest first | State. Sort by state, A to Z | Share | Held by |
|---|---|---|---|---|---|---|
| SPFT - Newberg Cogen | Gas, combustion turbine | Owns | 163.3 MW | US-OR | 100.0% | WESTROCK CO |
| Covington Facility | Biomass | Operates and owns | 160.9 MW | US-VA | 100.0% | WESTROCK CO |
| Mead Coated Board | Biomass | Owns | 120.5 MW | US-AL | 100.0% | WESTROCK CO |
| WestRock-West Point Mill | Biomass | Owns | 101 MW | US-VA | 100.0% | WESTROCK CO |
| Kapstone | Biomass | Owns | 99.2 MW | US-SC | 100.0% | WESTROCK CO |
| Fernandina Beach Mill | Biomass | Owns | 96.9 MW | US-FL | 100.0% | WESTROCK CO |
| Florence Mill | Biomass | Owns | 91.5 MW | US-SC | 100.0% | WESTROCK CO |
| WestRock Southeast, LLC. | Biomass | Owns | 82.1 MW | US-GA | 48.0% | WESTROCK CO |
| Westrock Hodge (LA) | Biomass | Owns | 66.4 MW | US-LA | 100.0% | WESTROCK CO |
| WestRock (WA) | Biomass | Owns | 64 MW | US-WA | 100.0% | WESTROCK CO |
| Hopewell Mill | Biomass | Owns | 47.6 MW | US-VA | 100.0% | WESTROCK CO |
| WestRock Demopolis Mill | Biomass | Owns | 47.4 MW | US-AL | 100.0% | WESTROCK CO |
| Longview Fibre | Biomass | Owns | 45 MW | US-WA | 100.0% | WESTROCK CO |
| WestRock Panama City Mill | Biomass | Owns | 34 MW | US-FL | 100.0% | WESTROCK CO |
| Seminole Mill | Gas, steam turbine | Owns | 30 MW | US-FL | 100.0% | WESTROCK CO |
| KapStone Kraft Paper Corp | Biomass | Owns | 28.3 MW | US-NC | 100.0% | WESTROCK CO |
| Uncasville Mill | Gas, steam turbine | Owns | 2.8 MW | US-CT | 100.0% | WESTROCK CO |
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Sources 3
Registers
3
Reuse terms
- 2 Open license
- 1 Open license, with credit
Latest read
2026-11-04
From its recordsSourcesThe registers behind this company's assets, projects and RFPs and the facts under its name; the company record itself is derived from them.
Sources
-
View at source →
EIA-860M ·
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Summary only: the source’s license keeps the full record at the source.
-
View at source →
GEM ·
Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)
Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. · license
In-file notice, About sheet of Global_Integrated_Power_September_2026_V2.xlsb (the owner's download, read 2026-10-26 with pyxlsb 1.0.10; decisions log 2026-10-26): "Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License. (See the CC license for attribution requirements if sharing or adapting the data set.)" and "Please note records with a “TZ ID” in the Other IDs (unit/phase) column were partially or fully sourced from the TransitionZero, Solar Asset Mapper, August 2025. Copyright © TransitionZero, Solar Asset Mapper, August 2025. Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)." Before it was read: no licence prose on the dataset page (retrieved 2026-10-23), which gives only "The recommended citation is "Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.""; GEM's download form records "Creative Commons Attribution 4.0 International (CC BY 4.0) — /creative-commons-license" (https://api.globalenergymonitor.org/static/gem-download-form.bundle.js, sha256 e5ecbeab…905e5b, retrieved 2026-10-23).
Summary only: the source’s license keeps the full record at the source.
-
View at source →
Wikidata ·
Wikidata — company items (official website, headquarters, description, LEI, stock listing, English Wikipedia link)
Source: Wikidata (CC0) · license
Wikidata:Copyright (https://www.wikidata.org/wiki/Wikidata:Copyright, read 2026-10-22): "All structured data from the main, Property, Lexeme, and EntitySchema namespaces is available under the Creative Commons CC0 License; text in the other namespaces is available under the Creative Commons Attribution-ShareAlike License; additional terms may apply." Wikidata:Licensing (read 2026-10-22): "All structured data (i.e. the main, Property, Lexeme, and EntitySchema namespaces) is released into the public domain under Creative Commons Zero." Access terms that bind us: Wikimedia Foundation User-Agent Policy (read 2026-10-22) "Scripts should use an informative User-Agent string with contact information, or they may be blocked without notice." and "Do not copy a browser's user agent for your bot, as bot-like behavior with a browser's user agent will be assumed malicious."; Wikimedia Foundation API Usage Guidelines v1.0 (2024-08-26) "When using Wikimedia APIs, an operator must: Follow the User-Agent policy ...; Follow rate limiting requests ...; Follow the requirements of the content licenses when republishing downloaded or cached data" and must not "Spread Wikimedia API requests over multiple user agents to hide excessive use by a single operator"; Robot policy (wikitech, read 2026-10-22) "Honor every directive in our robots.txt file.", "When we reply with a 429 Too Many Requests status code respect the delay specified by the Retry-After header", and, Action API rules, "If unauthenticated, keep the concurrency of your requests to 1 at a time, and below 5 requests per second overall." and "if your request takes more than 1 second to serve, please wait 5 seconds before making another request."; Wikidata Query Service User Manual (mediawiki.org, read 2026-10-22) "SPARQL queries can be submitted directly to the SPARQL endpoint with a GET or POST request to https://query.wikidata.org/sparql", "One client (user agent + IP) is allowed 60 seconds of processing time each 60 seconds", "Clients exceeding the limits above are throttled with HTTP code 429. Use Retry-After header to see when the request can be repeated." and "access to the service is limited to 5 parallel queries per IP."
Summary only: the source’s license keeps the full record at the source.
Around this company
Nearby 30
within 15 miProjects
30
within 15 mi
Nearest
2.4 mi
Subase Microgrid Project
All 30NearbyShowing all 30 nearby projects.
| Status | Name. Sort by name, A to Z | Type | MW. Sort by capacity, largest first | Distance, sorted ascending. Sort by distance, farthest first | Nearest asset |
|---|---|---|---|---|---|
| Postponed | Subase Microgrid Project | Gas, reciprocating engine | 13.1 MW | 2.4 mi away | nearest: Uncasville Mill |
| Filed | Peanut LLC | Large load | — | 4.0 mi away | nearest: Hopewell Mill |
| Built | CHIRISA RICHMOND LLC | Large load | — | 5.4 mi away | nearest: Hopewell Mill |
| Postponed | Weldon Solar | Solar | 5 MW | 5.5 mi away | nearest: KapStone Kraft Paper Corp |
| Built | 11751 MEADOWVILLE OWNER LLC C/O GFH CAPITAL LTD | Large load | — | 5.6 mi away | nearest: Hopewell Mill |
| Under construction | Groton Flanders Road Landfill | Solar | 5 MW | 6.3 mi away | nearest: Uncasville Mill |
| Postponed | CMEEC - Hollyhock Solar | Solar | 6 MW | 6.6 mi away | nearest: Uncasville Mill |
| Filed | Chesterfield | Gas, combustion turbine | 1,000 MW | 8.4 mi away | nearest: Hopewell Mill |
| Filed | Rhubarb One SC | Solar | 9.6 MW | 8.6 mi away | nearest: Florence Mill |
| Postponed | Halifax Solar LLC | Solar | 5 MW | 9.1 mi away | nearest: KapStone Kraft Paper Corp |
| Under construction | Petersburg - VA 0224 (Murphy) | Solar | 2.6 MW | 9.1 mi away | nearest: Hopewell Mill |
| Under construction | Greenwater BESS | Storage | 200 MW | 9.7 mi away | nearest: WestRock (WA) |
| Permitted | Richmond Road Solar LLC | Solar | 5 MW | 9.7 mi away | nearest: WestRock-West Point Mill |
| Postponed | McCormick Solar | Solar | 2 MW | 10.1 mi away | nearest: Florence Mill |
| Filed | Chester Solar Technology Park, LLC | Solar | 160 MW | 10.3 mi away | nearest: Hopewell Mill |
| Filed | Bridleton Solar | Solar | 20 MW | 11.7 mi away | nearest: Hopewell Mill |
| Postponed | Kings Bay Solar Facility | Storage | 1.5 MW | 11.7 mi away | nearest: Fernandina Beach Mill |
| Postponed | Chickahominy Power LLC | Gas, combined cycle | 1,716.3 MW | 12.3 mi away | nearest: Hopewell Mill |
| Filed | MYRA - Building 1 (Marion data centre) | Large load | — | 12.3 mi away | nearest: Florence Mill |
| Postponed | C4GT | Gas, combined cycle | 1,060 MW | 12.5 mi away | nearest: Hopewell Mill |
| Filed | PointOne Richmond LLC | Large load | — | 12.9 mi away | nearest: Hopewell Mill |
| Under construction | PROJECT TROPICAL PHASE 2 - DATA CENTER AND SUBSTAT | Large load | — | 13.2 mi away | nearest: Hopewell Mill |
| Built | MAGURO ENTERPRISES LLC | Large load | — | 13.3 mi away | nearest: Kapstone |
| Under construction | IRON MOUNTAIN DATA CENTER | Large load | — | 13.3 mi away | nearest: Hopewell Mill |
| Built | SCOUT DEVELOPMENT LLC | Large load | — | 13.6 mi away | nearest: Hopewell Mill |
| Built | QTS RICHMOND DATA CENTER | Large load | — | 13.9 mi away | nearest: Hopewell Mill |
| Built | Bank of America - Sandston | Large load | — | 14.2 mi away | nearest: Hopewell Mill |
| Under construction | FRP Forest Trail Solar | Solar | 50 MW | 14.2 mi away | nearest: Seminole Mill |
| Filed | Caden Energix New Kent, LLC | Solar | 20 MW | 14.5 mi away | nearest: WestRock-West Point Mill |
| Filed | Iron Mountain Information Management LLC | Large load | — | 14.5 mi away | nearest: Hopewell Mill |
Sources EIA-860M · Virginia DEQ · EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES
Sources
- EIA-860M
- Virginia DEQSource: Virginia Department of Environmental Quality
- EPA ICIS-Air
- FAA OE/AAA
- EPA ICIS-NPDES