GRS Fall River — Power plant · Biomass · Gas Recovery Systems IncSalt Cod BESS — Filed · Storage · MA · 168 MW · 3.7 km awayCONGRUITY 360 LLC — Built · Large load · MA · 6.3 km awayBorrego - Highland Ave — Under construction · Solar + storage · MA · 10 MW · 10.4 km awayTiverton Power Plant — Postponed · Gas, combined cycle · RI · 289.8 MW · 13.0 km awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 17.1 km awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 17.5 km awayClems Way Solar — Permitted · Solar · MA · 5 MW · 17.7 km awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 18.7 km awayMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 18.8 km awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 18.9 km awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 19.0 km awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 19.3 km awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 23.6 km awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 23.8 km away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

GRS Fall River

Power plant · Biomass

Key facts

Power plant · Biomass Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2000
Net generation, 2023
0 MWh
Grid
14 kV to Massachusetts Electric Co (ISNE)
Location
Bristol County, Massachusetts
Operated by
Gas Recovery Systems IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2023
Fuel burned MMBtu by year, 2001 to 2023
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
26 years since 2000
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeISNE

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2022
First unit retired
May 2012
Capacity retired
7.3 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Landfill Gas1 MWRetiredMay 2012
2Landfill Gas1 MWRetiredJune 2012
3Landfill Gas5.3 MWRetiredJanuary 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
14 kV
Transmission or distribution system owner
Massachusetts Electric Co
Balancing authority
ISO New England Inc.
NERC region
NPCC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 3 scheduled to retire, 5.3 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 1 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Salt Cod BESS Filed Storage 3.7 km 168
CONGRUITY 360 LLC Built Large load 6.3 km
Borrego - Highland Ave Under construction Solar + storage 10.4 km 10
Tiverton Power Plant Postponed Gas, combined cycle 13.0 km 289.8
Braley Hill North Solar Under construction Solar + storage 17.1 km 10
Featherbed Lane South Solar Under construction Solar + storage 17.5 km 2
Clems Way Solar Permitted Solar 17.7 km 5
Snipatuit Road Solar Under construction Solar + storage 18.7 km 8
MA Acushnet 540R Main St Filed Solar + storage 18.8 km 6
Logging Swamp North Permitted Solar 18.9 km 5
Logging Swamp South Permitted Solar 19.0 km 5
Cushman Road Solar Filed Solar + storage 19.3 km 6
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 23.6 km 4.5
Randall Lane Solar Under construction Solar + storage 23.8 km 10