- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Retired
- Size not stated
GRS Fall River: location and 14 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
GRS Fall River
Power plant · Biomass
Key facts
Power plant · Biomass Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2000
- Net generation, 2023
- 0 MWh
- Grid
- 14 kV to Massachusetts Electric Co (ISNE)
- Location
- Bristol County, Massachusetts
- Operated by
- Gas Recovery Systems IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 26 years since 2000
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | ISNE |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- January 2022
- First unit retired
- May 2012
- Capacity retired
- 7.3 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Landfill Gas | 1 MW | Retired | May 2012 |
| 2 | Landfill Gas | 1 MW | Retired | June 2012 |
| 3 | Landfill Gas | 5.3 MW | Retired | January 2022 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- Massachusetts Electric Co
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
Transmission lines within 25 km (10)
- Sykes Road - Bell Rock Road 115 kV
- Sykes Road - Somerset 115 kV
- Somerset 115 kV line
- Bell Rock Road 115 kV line
- Bell Rock Road 115 kV line
- Bell Rock Road - High Hill Switching Station 115 kV
- Taunton Tap - Somerset 115 kV
- Fall River - Chartley Pond 115 kV
- Berry Street - Fall River 345 kV
- Berry Street - Fall River 345 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 3 scheduled to retire, 5.3 MW · EIA-860M
- Stated Unit 2 scheduled to retire, 1 MW · EIA-860M
- Stated Unit 1 scheduled to retire, 1 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Salt Cod BESS Filed | Storage | 3.7 km | 168 |
| CONGRUITY 360 LLC Built | Large load | 6.3 km | |
| Borrego - Highland Ave Under construction | Solar + storage | 10.4 km | 10 |
| Tiverton Power Plant Postponed | Gas, combined cycle | 13.0 km | 289.8 |
| Braley Hill North Solar Under construction | Solar + storage | 17.1 km | 10 |
| Featherbed Lane South Solar Under construction | Solar + storage | 17.5 km | 2 |
| Clems Way Solar Permitted | Solar | 17.7 km | 5 |
| Snipatuit Road Solar Under construction | Solar + storage | 18.7 km | 8 |
| MA Acushnet 540R Main St Filed | Solar + storage | 18.8 km | 6 |
| Logging Swamp North Permitted | Solar | 18.9 km | 5 |
| Logging Swamp South Permitted | Solar | 19.0 km | 5 |
| Cushman Road Solar Filed | Solar + storage | 19.3 km | 6 |
| BlueWave Capital-Mattapoisett (SREC II) Postponed | Solar | 23.6 km | 4.5 |
| Randall Lane Solar Under construction | Solar + storage | 23.8 km | 10 |
Sources EIA-860M · EPA ICIS-Air