GRS Pine Bend: location and 7 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
GRS Pine Bend
Power plant · Biomass
Key facts
Power plant · Biomassran 6% of 2018 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1996
- Net generation, 2018
- 9,217 MWh
- Location
- Dakota County, Minnesota
- Operated by
- Pine Bend LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 30 years since 1996
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | MISO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- June 2018
- First unit retired
- January 2013
- Capacity retired
- 16.6 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 3 | Landfill Gas | 6.6 MW | Retired | January 2013 |
| 1 | Landfill Gas | 5 MW | Retired | June 2018 |
| 2 | Landfill Gas | 5 MW | Retired | June 2018 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- MISO
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2 scheduled to retire, 10 MW · EIA-860M
- Stated Unit 3 scheduled to retire, 6.6 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Dakota Solar Postponed | Solar | 4.4 km | 3 |
| JIMNIST LLC Built | Large load | 5.9 km | |
| EAGAN 5 MW DATA CENTER Built | Large load | 6.2 km | |
| Gladiolus Solar, LLC Postponed | Solar | 7.6 km | 1 |
| DATABANK - EAGAN - MSP2 Built | Large load | 9.1 km | |
| IRON GATE DATA CENTERS - EAGAN Built | Large load | 10.8 km | |
| Black Dog Postponed | Gas, combined cycle | 15.6 km | 760 |
Sources EIA-860M · EPA ICIS-Air