Show on map
Inver Hills - Maxwell 345 kV — Transmission lineDakota Solar — Postponed · Solar · MN · 3 MW · 0.4 mi awayJIMNIST LLC — Built · Large load · MN · 3.4 mi awayEAGAN 5 MW DATA CENTER — Built · Large load · MN · 3.6 mi awayGladiolus Solar, LLC — Postponed · Solar · MN · 1 MW · 4.2 mi awayDATABANK - EAGAN - MSP2 — Built · Large load · MN · 5.4 mi awayIRON GATE DATA CENTERS - EAGAN — Built · Large load · MN · 6.6 mi awayBlack Dog — Postponed · Gas, combined cycle · MN · 760 MW · 10.1 mi awayFAIRVIEW DATA CENTER — Built · Large load · MN · 12.6 mi awayHB FULLER CO - DATA CENTER - ARDEN HILLS — Built · Large load · MN · 13.4 mi awaySUPERCOMPUTER LLC — Built · Large load · MN · 14.8 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Inver Hills - Maxwell 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-MN
Owner (as stated)
Northern States Power Minnesota

Details

Who’s behind it

Owner
Northern States Power Minnesota

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
9
Substations at the ends (as the source names them)
Inver Hills to Maxwell
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itnorthern states power minnesota
HIFLD line ID161554
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Dakota Solar Postponed Solar 0.4 mi 3
JIMNIST LLC Built Large load 3.4 mi
EAGAN 5 MW DATA CENTER Built Large load 3.6 mi
Gladiolus Solar, LLC Postponed Solar 4.2 mi 1
DATABANK - EAGAN - MSP2 Built Large load 5.4 mi
IRON GATE DATA CENTERS - EAGAN Built Large load 6.6 mi
Black Dog Postponed Gas, combined cycle 10.1 mi 760
FAIRVIEW DATA CENTER Built Large load 12.6 mi
HB FULLER CO - DATA CENTER - ARDEN HILLS Built Large load 13.4 mi
SUPERCOMPUTER LLC Built Large load 14.8 mi

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution