Heat Recovery Coke Facility: location and 4 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Heat Recovery Coke Facility
Power plant · Other
Key facts
Power plant · Otherran 51% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1998
- Net generation, 2025
- 419,318 MWh
- Grid
- 138 kV to Northern Indiana Pub Serv Co (MISO)
- Location
- Lake County, Indiana
- Operated by
- Cokenergy Inc
Output
- Gas
- Unspecified fuel
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Other source: “All Other”
- Age
- 28 years since 1998
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 1,430,712 |
| Capacity factor, 2025 | 0.506 |
| Net generation (MWh), 2025 | 419,318 |
| Balancing authority code | MISO |
Ownership
4 companies4| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Cokenergy Inc | Operator | EIA-860M | ||
| SUNCOKE ENERGY INC | Owner | 85.0% | Dec 31, 2023 | EPA GHGRP |
| DTE ENERGY CO | Owner | 15.0% | Dec 31, 2023 | EPA GHGRP |
| Primary Energy | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| W 167th St Under construction | Solar | 12.5 mi | 1.5 |
| DATA CENTER Built | Large load | 13.8 mi | |
| HOBART DATA CENTER MASS GRADING - 1 Under construction | Large load | 13.9 mi | |
| Robbins Community Power LLC Postponed | Biomass | 14.7 mi | 55 |
Sources EIA-860M · EPA ICIS-NPDES