Show on map
HEB00110 — Power plant · Gas, reciprocating engine · Texas Microgrid, LLCCrowned Heron 2 - Storage, LLC — Built · Storage · TX · 154.2 MW · 6.3 mi awayJack Fusco Energy Center — Postponed · Gas, combined cycle · TX · 400 MW · 6.9 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 9.1 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 9.1 mi awayImperial Power Plant LLC — Postponed · Gas, reciprocating engine · TX · 12 MW · 9.3 mi awayTX17 Nickel Prairie Storage — Postponed · Storage · TX · 100 MW · 14.2 mi away
  • Combustion
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
155 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Fort Bend County, Texas
Operated by
Texas Microgrid, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2021 to 2025
Fuel burned MMBtu by year, 2021 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
9 years since 2017
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
17,200 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20252,666
Capacity factor, 20250.015
Heat rate (Btu/kWh), 202517,200
Net generation (MWh), 2025155
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Crowned Heron 2 - Storage, LLC Built Storage 6.3 mi 154.2
Jack Fusco Energy Center Postponed Gas, combined cycle 6.9 mi 400
Callisto II Energy Center Under construction Storage 9.1 mi 303.2
Pamela Heights I Energy Center Under construction Storage 9.1 mi 101.7
Imperial Power Plant LLC Postponed Gas, reciprocating engine 9.3 mi 12
TX17 Nickel Prairie Storage Postponed Storage 14.2 mi 100

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution