Helios Plaza CHP Plant — Power plant · Gas, combustion turbine · BP Helios PlazaImperial Power Plant LLC — Postponed · Gas, reciprocating engine · TX · 12 MW · 11.6 mi awayBESS TX Camarine - BSHOU001 — Under construction · Storage · TX · 9.9 MW · 13.4 mi awayCallisto II Energy Center — Under construction · Storage · TX · 303.2 MW · 14.5 mi awayPamela Heights I Energy Center — Under construction · Storage · TX · 101.7 MW · 14.5 mi away
  • Combustion
  • Storage
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Helios Plaza CHP Plant

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 37% of 2016 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2016
15,110 MWh
Location
Harris County, Texas
Operated by
BP Helios PlazaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2013 to 2017
Fuel burned MMBtu by year, 2013 to 2017
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
16 years since 2010
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeERCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
November 2017
Capacity retired
4.6 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Natural Gas Fired Combustion Turbine4.6 MWRetiredNovember 2017

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
ERCO
Transmission lines within 15 mi (10)
Connection points within 15 mi (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit GEN1 scheduled to retire, 4.6 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · OpenStreetMap · ERCOT · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Imperial Power Plant LLC Postponed Gas, reciprocating engine 11.6 mi 12
BESS TX Camarine - BSHOU001 Under construction Storage 13.4 mi 9.9
Callisto II Energy Center Under construction Storage 14.5 mi 303.2
Pamela Heights I Energy Center Under construction Storage 14.5 mi 101.7

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026