Show on map
Honeywell Farms — Power plant · Gas, reciprocating engine · Honeywell Farm IncWater Willow A Clean Energy LLC — Under construction · Storage · NY · 3.9 MW · 1.3 mi awayWater Willow B Clean Energy LLC — Under construction · Storage · NY · 3.9 MW · 1.3 mi awayCoral Honeysuckle Clean Energy LLC — Under construction · Storage · NY · 3.7 MW · 1.7 mi awayLinden Clean Energy, LLC — Under construction · Storage · NY · 3.7 MW · 1.7 mi awayKennedy International Airport Cogen — Postponed · Gas, combustion turbine · NY · 50 MW · 4.0 mi awayRoseate Tern Clean Energy LLC — Under construction · Storage · NY · 3.3 MW · 4.7 mi awayBlue Aster B Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 5.5 mi awayBlue Aster Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 5.5 mi awayBlue Aster C Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 5.5 mi awayJamaica Community Energy, LLC — Under construction · Storage · NY · 4.9 MW · 7.9 mi awayBensonhurst Energy Storage 1 LLC — Under construction · Storage · NY · 5 MW · 8.2 mi awayAstoria Gas Turbines — Postponed · Gas, combustion turbine · NY · 431 MW · 8.3 mi awayPiping Plover Clean Energy, LLC — Under construction · Storage · NY · 2.3 MW · 8.8 mi awayWarbler Clean Energy LLC — Under construction · Storage · NY · 2.3 MW · 8.8 mi awayRavenswood — Postponed · Storage · NY · 316 MW · 8.8 mi awayHeron Clean Energy, LLC — Under construction · Storage · NY · 4.9 MW · 8.8 mi awayNISA Electric Generation Project — Permitted · Storage · NY · 300 MW · 8.9 mi awayNISA Electric Generation Project — Postponed · Gas, combined cycle · NY · 92.5 MW · 8.9 mi awayNew York University Central Plant — Under construction · Gas, combined cycle · NY · 5.5 MW · 9.1 mi awayWintergreen Clean Energy, LLC — Under construction · Storage · NY · 4.9 MW · 9.3 mi awayWintergreen C Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 9.3 mi awayWintergreen B Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 9.3 mi awayWintergreen D Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 9.3 mi awayHecate Grid Intrepid — Postponed · Storage · NY · 300 MW · 9.5 mi awayLincoln Medical and Mental Health Center — Under construction · Oil · NY · 1 MW · 10.5 mi awayGowanus Gas Turbines Generating — Postponed · Gas, combustion turbine · NY · 93 MW · 11.0 mi awayCDIL DATA CENTRE USA LLC — Built · Large load · NY · 11.0 mi awayPlant No 1 Freeport — Under construction · Biomass · NY · 3 MW · 11.2 mi awayLobelia Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 11.9 mi awayLobelia 4452 Clean Energy LLC — Under construction · Storage · NY · 4.9 MW · 11.9 mi awayCYXTERA - NJ2X — Built · Large load · NJ · 12.7 mi awayEastern BlueBird Clean Energy LLC — Under construction · Storage · NY · 4.4 MW · 13.1 mi awayNorthern Cardinal Clean Energy, LLC — Under construction · Storage · NY · 4.4 MW · 13.1 mi awayCORESITE NY4 DATA CENTER — Under construction · Large load · NJ · 14.9 mi away
  • Combustion
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Honeywell Farms

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 19% of 2016 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1974
Net generation, 2016
7,381 MWh
Location
Queens County, New York
Operated by
Honeywell Farm IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2016
Fuel burned MMBtu by year, 2001 to 2016
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
52 years since 1974
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeNYIS

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2016
Capacity retired
4.4 MW
Generators retired
6
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Internal Combustion Engine0.8 MWRetiredDecember 2016
2Natural Gas Internal Combustion Engine0.8 MWRetiredDecember 2016
3Petroleum Liquids0.8 MWRetiredDecember 2016
4Petroleum Liquids0.8 MWRetiredDecember 2016
5Natural Gas Internal Combustion Engine0.8 MWRetiredDecember 2016
6Natural Gas Internal Combustion Engine0.4 MWRetiredDecember 2016
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Internal Combustion Engine2.8 MW
Petroleum Liquids1.6 MW

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
NYIS
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3, 4, 5, 6 scheduled to retire, 4.4 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Water Willow A Clean Energy LLC Under construction Storage 1.3 mi 3.9
Water Willow B Clean Energy LLC Under construction Storage 1.3 mi 3.9
Coral Honeysuckle Clean Energy LLC Under construction Storage 1.7 mi 3.7
Linden Clean Energy, LLC Under construction Storage 1.7 mi 3.7
Kennedy International Airport Cogen Postponed Gas, combustion turbine 4.0 mi 50
Roseate Tern Clean Energy LLC Under construction Storage 4.7 mi 3.3
Blue Aster B Clean Energy LLC Under construction Storage 5.5 mi 4.9
Blue Aster Clean Energy LLC Under construction Storage 5.5 mi 4.9
Blue Aster C Clean Energy LLC Under construction Storage 5.5 mi 4.9
Jamaica Community Energy, LLC Under construction Storage 7.9 mi 4.9
Bensonhurst Energy Storage 1 LLC Under construction Storage 8.2 mi 5
Astoria Gas Turbines Postponed Gas, combustion turbine 8.3 mi 431
Piping Plover Clean Energy, LLC Under construction Storage 8.8 mi 2.3
Warbler Clean Energy LLC Under construction Storage 8.8 mi 2.3
Ravenswood Postponed Storage 8.8 mi 316
Heron Clean Energy, LLC Under construction Storage 8.8 mi 4.9
NISA Electric Generation Project × 2 units Permitted Storage 8.9 mi 392.5
New York University Central Plant Under construction Gas, combined cycle 9.1 mi 5.5
Wintergreen Clean Energy, LLC Under construction Storage 9.3 mi 4.9
Wintergreen C Clean Energy LLC Under construction Storage 9.3 mi 4.9
Wintergreen B Clean Energy LLC Under construction Storage 9.3 mi 4.9
Wintergreen D Clean Energy LLC Under construction Storage 9.3 mi 4.9
Hecate Grid Intrepid Postponed Storage 9.5 mi 300
Lincoln Medical and Mental Health Center Under construction Oil 10.5 mi 1
Gowanus Gas Turbines Generating Postponed Gas, combustion turbine 11.0 mi 93
CDIL DATA CENTRE USA LLC Built Large load 11.0 mi
Plant No 1 Freeport Under construction Biomass 11.2 mi 3
Lobelia Clean Energy LLC Under construction Storage 11.9 mi 4.9
Lobelia 4452 Clean Energy LLC Under construction Storage 11.9 mi 4.9
CYXTERA - NJ2X Built Large load 12.7 mi
Eastern BlueBird Clean Energy LLC Under construction Storage 13.1 mi 4.4
Northern Cardinal Clean Energy, LLC Under construction Storage 13.1 mi 4.4
CORESITE NY4 DATA CENTER Under construction Large load 14.9 mi

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution