Show on map
Hookers Point — Power plant · Oil · Tampa Electric CoH L Culbreath Bayside Power Station — Gas, combustion turbine · FL · 503.8 MW · 4.0 km awayTampa Electric Co NA 2 — Gas, combustion turbine · FL · 982 MW · 4.0 km awaySouth Tampa Energy Storage — Storage · FL · 20 MW · 10.6 km awayTampa Electric Co NA 3 — Gas, combustion turbine · FL · 99 MW · 16.3 km awayBig Bend III Battery Storage — Storage · FL · 75 MW · 16.4 km away
  • Combustion
  • Storage
  • In development
  • Retired
  • 10 · 100 · 1,000 MW

Hookers Point

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1948
Net generation, 2002
-1,983 MWh
Location
Hillsborough County, Florida
Operated by
Tampa Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2002
Fuel burned MMBtu by year, 2001 to 2002
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
78 years since 1948

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2003
Capacity retired
232.6 MW
Generators retired
5
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids33 MWRetiredJanuary 2003
2Petroleum Liquids34.5 MWRetiredJanuary 2003
3Petroleum Liquids34.5 MWRetiredJanuary 2003
4Petroleum Liquids49 MWRetiredJanuary 2003
5Petroleum Liquids81.6 MWRetiredJanuary 2003

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 3, 4, 5 scheduled to retire, 232.6 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
H L Culbreath Bayside Power Station Postponed Gas, combustion turbine 4.0 km 503.8
Tampa Electric Co NA 2 Postponed Gas, combustion turbine 4.0 km 982
South Tampa Energy Storage Postponed Storage 10.6 km 20
Tampa Electric Co NA 3 Postponed Gas, combustion turbine 16.3 km 99
Big Bend III Battery Storage Permitted Storage 16.4 km 75

Sources EIA-860M

Sources

Attribution