Hunters Point: location and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Hunters Point
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbineran 17% of 2005 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1948
- Net generation, 2005
- 619,481 MWh
- Location
- San Francisco County, California
- Operated by
- Pacific Gas & Electric Co.SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 78 years since 1948
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- May 2006
- Capacity retired
- 427.4 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 2 | Natural Gas Steam Turbine | 107.5 MW | Retired | May 2006 |
| 3 | Natural Gas Steam Turbine | 107.5 MW | Retired | May 2006 |
| 4 | Natural Gas Steam Turbine | 156.2 MW | Retired | May 2006 |
| GT1 | Petroleum Liquids | 56.2 MW | Retired | May 2006 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Steam Turbine | 371.2 MW | |
| Petroleum Liquids | 56.2 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- NERC region
- WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 2, 3, 4, GT1 scheduled to retire, 427.4 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISOSource: California ISO
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| San Francisco Electric Reliability Proj Withdrawn | Gas, combustion turbine | 3.6 mi | 151.5 |
| San Francisco Intl Airport Ct Project Postponed | Gas, combustion turbine | 6.8 mi | 48 |
| Dynegy Oakland Power Plant Announced | Storage | 7.3 mi | 43.3 |
| San Leandro 10 - sleba702 Under construction | Solar | 11.4 mi | 1 |
| Richmond Cogen Postponed | Gas, combined cycle | 14.4 mi | 43 |