Show on map
Hunters Point — Power plant · Gas, steam turbine · Pacific Gas & Electric Co.San Francisco Electric Reliability Proj — Withdrawn · Gas, combustion turbine · CA · 151.5 MW · 3.6 mi awaySan Francisco Intl Airport Ct Project — Postponed · Gas, combustion turbine · CA · 48 MW · 6.8 mi awayDynegy Oakland Power Plant — Announced · Storage · CA · 43.3 MW · 7.3 mi awaySan Leandro 10 - sleba702 — Under construction · Solar · CA · 1 MW · 11.4 mi awayRichmond Cogen — Postponed · Gas, combined cycle · CA · 43 MW · 14.4 mi away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Hunters Point

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 17% of 2005 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1948
Net generation, 2005
619,481 MWh
Location
San Francisco County, California
Operated by
Pacific Gas & Electric Co.SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2006
Fuel burned MMBtu by year, 2001 to 2006
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
78 years since 1948

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
May 2006
Capacity retired
427.4 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Natural Gas Steam Turbine107.5 MWRetiredMay 2006
3Natural Gas Steam Turbine107.5 MWRetiredMay 2006
4Natural Gas Steam Turbine156.2 MWRetiredMay 2006
GT1Petroleum Liquids56.2 MWRetiredMay 2006
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine371.2 MW
Petroleum Liquids56.2 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
NERC region
WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 2, 3, 4, GT1 scheduled to retire, 427.4 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
San Francisco Electric Reliability Proj Withdrawn Gas, combustion turbine 3.6 mi 151.5
San Francisco Intl Airport Ct Project Postponed Gas, combustion turbine 6.8 mi 48
Dynegy Oakland Power Plant Announced Storage 7.3 mi 43.3
San Leandro 10 - sleba702 Under construction Solar 11.4 mi 1
Richmond Cogen Postponed Gas, combined cycle 14.4 mi 43

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 12, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution