Show on map
IGS KSBD — Power plant · Solar · Altus Power America Management, LLCSolar Photovoltaic Project #20 — Solar · CA · 3.5 MW · 3.4 km awaySunE Redlands — Solar · CA · 1.5 MW · 3.5 km awayRedlands DC 9 - sline609 — Solar + storage · CA · 5 MW · 3.8 km awaySolar Photovoltaic Project #28 — Solar · CA · 0.5 MW · 3.8 km awayEnergy Center — Gas, combustion turbine · CA · 0.9 MW · 8.0 km awayOES Biogas Power — Biomass · CA · 2.6 MW · 12.7 km awayCA Bloomington 2551 S Lilac Avenue Micro — Solar + storage · CA · 3 MW · 14.3 km awaySolar Photovoltaic Project #24 — Solar · CA · 4 MW · 14.8 km awayCA Riverside 2356 Fleetwood Dr. — Solar + storage · CA · 4 MW · 17.0 km awaySolar Photovoltaic Project #27 — Solar · CA · 1 MW · 17.4 km awaySolar Photovoltaic Project #25 — Solar · CA · 4.5 MW · 17.4 km awaySolar Photovoltaic Project #30 — Solar · CA · 1.5 MW · 18.2 km awayRCWMD Badlands Landfill Gas Project — Biomass · CA · 1.2 MW · 19.2 km awaySolar Photovoltaic Project #17 — Solar · CA · 0.5 MW · 25.0 km away
  • Combustion
  • Wind & solar
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Solar

Key facts

Power plant · Solarran 24% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
9,070 MWh
Grid
12 kV to Southern California Edison Co (CISO)
Location
San Bernardino County, California
Operated by
Altus Power America Management, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816148
Location id
L100000813445
Eia plant ids
65091
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202530,947
Capacity factor, 20250.241
Net generation (MWh), 20259,070
Balancing authority codeCISO

Solar arrays

Array area (acres)
13
AC capacity (MW)
4.3
DC capacity (MW)
5.7
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2022

Source USPVDB

Source

  • U.S. Large-Scale Solar Photovoltaic DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #20 Postponed Solar 3.4 km 3.5
SunE Redlands Postponed Solar 3.5 km 1.5
Redlands DC 9 - sline609 Under construction Solar + storage 3.8 km 5
Solar Photovoltaic Project #28 Postponed Solar 3.8 km 0.5
Energy Center Announced Gas, combustion turbine 8.0 km 0.9
OES Biogas Power Under construction Biomass 12.7 km 2.6
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 14.3 km 3
Solar Photovoltaic Project #24 Postponed Solar 14.8 km 4
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 17.0 km 4
Solar Photovoltaic Project #27 Postponed Solar 17.4 km 1
Solar Photovoltaic Project #25 Postponed Solar 17.4 km 4.5
Solar Photovoltaic Project #30 Postponed Solar 18.2 km 1.5
RCWMD Badlands Landfill Gas Project Postponed Biomass 19.2 km 1.2
Solar Photovoltaic Project #17 Postponed Solar 25.0 km 0.5

Sources EIA-860M

Sources

Attribution