Indian Orchard Plant 1 — Power plant · Gas, steam turbine · Solutia Inc-IndianPalmer Renewable Energy — Postponed · Biomass · MA · 42 MW · 1.2 mi awayStony Brook — Postponed · Gas, combined cycle · MA · 422 MW · 2.9 mi awayChicopee BESS — Under construction · Storage · MA · 5 MW · 4.6 mi awayRiverside Holyoke — Postponed · Hydro · MA · 1.1 MW · 4.7 mi awayHadley Falls — Postponed · Hydro · MA · 3.5 MW · 5.6 mi awayHolyoke MA BESS 1 — Under construction · Storage · MA · 5 MW · 6.4 mi awayBelchertown Solar PV + Battery Project — Under construction · Solar + storage · MA · 5.6 MW · 12.6 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Indian Orchard Plant 1

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 4% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1985
Net generation, 2025
2,178 MWh
Grid
14 kV to Western Massachusetts Electric Company (ISNE)
Location
Hampden County, Massachusetts
Operated by
Solutia Inc-IndianSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
41 years since 1985
Unused energy
48 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
14.10
Transmission owner
Western Massachusetts Electric Company
Balancing authority code
ISNE
Balancing authority name
ISO New England Inc.
Fuel burned (MMBtu), 2025907,202
Capacity factor, 20250.044
Net generation (MWh), 20252,178
Balancing authority codeISNE
Data notes (1)
  • Heat rate (Btu/kWh), 2025 not shown: computed 416529.8 outside 5000-30000 Btu/kWh

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Palmer Renewable Energy Postponed Biomass 1.2 mi 42
Stony Brook Postponed Gas, combined cycle 2.9 mi 422
Chicopee BESS Under construction Storage 4.6 mi 5
Riverside Holyoke Postponed Hydro 4.7 mi 1.1
Hadley Falls Postponed Hydro 5.6 mi 3.5
Holyoke MA BESS 1 Under construction Storage 6.4 mi 5
Belchertown Solar PV + Battery Project Under construction Solar + storage 12.6 mi 5.6

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution