Inland Empire Energy Storage — Power plant · Storage · Strata Manager, LLCSolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 0.6 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 0.6 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 4.7 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 5.1 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 6.1 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 6.7 mi awaySolar Photovoltaic Project #19 — Postponed · Solar · CA · 5 MW · 6.8 mi awaySolar Photovoltaic Project #18 — Postponed · Solar · CA · 0.5 MW · 6.9 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 7.1 mi awaySolar Photovoltaic Project #23 — Postponed · Solar · CA · 0.5 MW · 7.1 mi awaySolar Photovoltaic Project #10 — Postponed · Solar · CA · 0.5 MW · 7.2 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 7.3 mi awaySolar Photovoltaic Project #04 — Postponed · Solar · CA · 1.5 MW · 7.5 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 8.7 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 8.9 mi awaySolar Photovoltaic Project #21 — Postponed · Solar · CA · 2.5 MW · 9.0 mi awaySolar Photovoltaic Project #31 — Postponed · Solar · CA · 1 MW · 9.3 mi awaySolar Photovoltaic Project #12 — Postponed · Solar · CA · 0.5 MW · 10.6 mi awaySolar Photovoltaic Project #08 — Postponed · Solar · CA · 0.5 MW · 10.8 mi awaySunE Redlands — Postponed · Solar · CA · 1.5 MW · 10.8 mi awaySolar Photovoltaic Project #09 — Postponed · Solar · CA · 0.5 MW · 11.1 mi awaySolar Photovoltaic Project #20 — Postponed · Solar · CA · 3.5 MW · 12.6 mi awayRoadhouse Energy Center — Contracted · Storage · CA · 300 MW · 12.6 mi awayRedlands DC 9 - sline609 — Under construction · Solar + storage · CA · 5 MW · 12.7 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Inland Empire Energy Storage

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
-10,435 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
San Bernardino County, California

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
66
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-10,435
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -10435.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Strata Manager, LLC Operator EIA-860M
Inland Empire Energy Storage Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #27 Postponed Solar 0.6 mi 1
Solar Photovoltaic Project #25 Postponed Solar 0.6 mi 4.5
OES Biogas Power Under construction Biomass 4.7 mi 2.6
Solar Photovoltaic Project #30 Postponed Solar 5.1 mi 1.5
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 6.1 mi 3
Solar Photovoltaic Project #17 Postponed Solar 6.7 mi 0.5
Solar Photovoltaic Project #19 Postponed Solar 6.8 mi 5
Solar Photovoltaic Project #18 Postponed Solar 6.9 mi 0.5
Solar Photovoltaic Project #14 Postponed Solar 7.1 mi 1.5
Solar Photovoltaic Project #23 Postponed Solar 7.1 mi 0.5
Solar Photovoltaic Project #10 Postponed Solar 7.2 mi 0.5
Solar Photovoltaic Project #24 Postponed Solar 7.3 mi 4
Solar Photovoltaic Project #04 Postponed Solar 7.5 mi 1.5
Solar Photovoltaic Project #28 Postponed Solar 8.7 mi 0.5
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 8.9 mi 4
Solar Photovoltaic Project #21 Postponed Solar 9.0 mi 2.5
Solar Photovoltaic Project #31 Postponed Solar 9.3 mi 1
Solar Photovoltaic Project #12 Postponed Solar 10.6 mi 0.5
Solar Photovoltaic Project #08 Postponed Solar 10.8 mi 0.5
SunE Redlands Postponed Solar 10.8 mi 1.5
Solar Photovoltaic Project #09 Postponed Solar 11.1 mi 0.5
Solar Photovoltaic Project #20 Postponed Solar 12.6 mi 3.5
Roadhouse Energy Center Contracted Storage 12.6 mi 300
Redlands DC 9 - sline609 Under construction Solar + storage 12.7 mi 5

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO

Attribution