- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Kaiser - LA: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Kaiser - LA
Power plant · Gas, other
Key facts
Power plant · Gas, otherran 93% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 36,854 MWh
- Grid
- 4 kV to Los Angeles Department of Water & Power (CISO)
- Location
- Los Angeles County, California
- Operated by
- Bloom EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 36,854
MWh - Fuel burned, 2025
- 446,079
MMBtu - Capacity factor, 2025
- 93.5
% - Heat rate, 2025
- 12,104
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 36,854 | 446,079 | 93.5% | 12,104 |
| 2024 | 19,071 | 132,558 | 48.2% | 6,951 |
| 2023 | 33,073 | 230,076 | 83.9% | 6,957 |
| 2022 | 36,053 | 252,856 | 91.5% | 7,014 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.