Kaiser - LA — Power plant · Gas, other · Bloom EnergyLATTC South Campus Solar — Solar · CA · 1.1 MW · 7.8 km awayScholl Canyon — Biomass · CA · 12 MW · 11.4 km awayPRIME DATA CENTER VERNON — Large load · CA · 12.4 km awayGlenarm BESS Plant — Storage · CA · 25 MW · 14.0 km awayCalifornia Institute of Technology — Gas, combined cycle · CA · 16.5 MW · 16.3 km awayBandini - SLLAX710 — Solar · CA · 1.3 MW · 19.6 km awayFoothill Solar Project — Solar · CA · 1.1 MW · 19.9 km awayAB Van Nuys — Solar · CA · 1.6 MW · 21.5 km awayScattergood — Gas, combined cycle · CA · 346 MW · 23.5 km away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Kaiser - LA

Power plant · Gas, other

Key facts

Power plant · Gas, otherran 93% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
36,854 MWh
Grid
4 kV to Los Angeles Department of Water & Power (CISO)
Location
Los Angeles County, California
Operated by
Bloom EnergySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2022 to 2025
Fuel burned MMBtu by year, 2022 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, other source: “Other Natural Gas”
Age
6 years since 2020
Heat rate
12,104 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
4.20
Transmission owner
Los Angeles Department of Water & Power
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025446,079
Capacity factor, 20250.935
Heat rate (Btu/kWh), 202512,104
Net generation (MWh), 202536,854
Balancing authority codeCISO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
LATTC South Campus Solar Postponed Solar 7.8 km 1.1
Scholl Canyon Under construction Biomass 11.4 km 12
PRIME DATA CENTER VERNON Built Large load 12.4 km
Glenarm BESS Plant Filed Storage 14.0 km 25
California Institute of Technology Postponed Gas, combined cycle 16.3 km 16.5
Bandini - SLLAX710 Under construction Solar 19.6 km 1.3
Foothill Solar Project Postponed Solar 19.9 km 1.1
AB Van Nuys Announced Solar 21.5 km 1.6
Scattergood Postponed Gas, combined cycle 23.5 km 346